Pearl Building Rating System - Estidama
Pearl Building Rating System - Estidama
Pearl Building Rating System - Estidama
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
LBo-1: Improved Outdoor Thermal Comfort<br />
Intent To improve outdoor thermal comfort during transition months and further reduce<br />
thermal discomfort during summer months in public spaces and walkways.<br />
Credit<br />
Requirements<br />
Awarding Credit<br />
Points<br />
Credit<br />
Submission:<br />
Design <strong>Rating</strong><br />
Credit<br />
Submission:<br />
Construction<br />
GENERAL<br />
Demonstrate that the outdoor thermal comfort strategy has been improved beyond the<br />
minimum established under credit LBo-R3 Outdoor Thermal Comfort Strategy by<br />
increasing the shade measures as follows :<br />
Space Type 1 Credit<br />
Point<br />
Surface car parking (including parking on roof<br />
surfaces)<br />
Public Open Space (including privately<br />
owned)<br />
Primary Pedestrian Walkway (based on 1.8m<br />
width within the through zone)<br />
Secondary Pedestrian Walkway (based on<br />
1.8m width within the through zone)<br />
2 Credit<br />
Points<br />
50 % 55 %<br />
65 % 70 %<br />
80 % 85 %<br />
80 % 85 %<br />
Cycle tracks 55 % 65 %<br />
ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />
� Where cover is provided by structures such as canopies or other architectural<br />
elements, the outer surface of the shading element must have a minimum Solar<br />
Reflectance Index (SRI) of 29.<br />
� Shade from trees should be measured at 3 years growth.<br />
� Public open space shade requirements exclude active recreational areas such as<br />
playing fields and ball courts.<br />
CREDIT POINTS REQUIREMENTS<br />
2<br />
(maximum)<br />
Design <strong>Rating</strong><br />
1 Meet shading requirements for 1 credit point.<br />
2 Meet shading requirements for 2 credit points.<br />
2<br />
(maximum)<br />
Construction <strong>Rating</strong><br />
1 Meet shading requirements for 1 credit point.<br />
2 Meet shading requirements for 2 credit points.<br />
� Updated Outdoor Thermal Comfort Strategy report from LBo-R3 with additional<br />
section that compares and demonstrates shading improvements;<br />
� Plan and tabulated results showing achievement of % of shading of applicable<br />
spaces at 1:00pm clock time on the Equinox and Summer Solstice; and<br />
� Extracts from specifications relating to the SRI of all cover elements.<br />
� Updated outdoor thermal comfort strategy including narrative supported by as-built<br />
drawings and photographs of the applicable shade areas, highlighting all measures<br />
contributing to improving the exterior microclimate, including planned or existing<br />
<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 57 of 223