12.01.2013 Views

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LBo-1: Improved Outdoor Thermal Comfort<br />

Intent To improve outdoor thermal comfort during transition months and further reduce<br />

thermal discomfort during summer months in public spaces and walkways.<br />

Credit<br />

Requirements<br />

Awarding Credit<br />

Points<br />

Credit<br />

Submission:<br />

Design <strong>Rating</strong><br />

Credit<br />

Submission:<br />

Construction<br />

GENERAL<br />

Demonstrate that the outdoor thermal comfort strategy has been improved beyond the<br />

minimum established under credit LBo-R3 Outdoor Thermal Comfort Strategy by<br />

increasing the shade measures as follows :<br />

Space Type 1 Credit<br />

Point<br />

Surface car parking (including parking on roof<br />

surfaces)<br />

Public Open Space (including privately<br />

owned)<br />

Primary Pedestrian Walkway (based on 1.8m<br />

width within the through zone)<br />

Secondary Pedestrian Walkway (based on<br />

1.8m width within the through zone)<br />

2 Credit<br />

Points<br />

50 % 55 %<br />

65 % 70 %<br />

80 % 85 %<br />

80 % 85 %<br />

Cycle tracks 55 % 65 %<br />

ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />

� Where cover is provided by structures such as canopies or other architectural<br />

elements, the outer surface of the shading element must have a minimum Solar<br />

Reflectance Index (SRI) of 29.<br />

� Shade from trees should be measured at 3 years growth.<br />

� Public open space shade requirements exclude active recreational areas such as<br />

playing fields and ball courts.<br />

CREDIT POINTS REQUIREMENTS<br />

2<br />

(maximum)<br />

Design <strong>Rating</strong><br />

1 Meet shading requirements for 1 credit point.<br />

2 Meet shading requirements for 2 credit points.<br />

2<br />

(maximum)<br />

Construction <strong>Rating</strong><br />

1 Meet shading requirements for 1 credit point.<br />

2 Meet shading requirements for 2 credit points.<br />

� Updated Outdoor Thermal Comfort Strategy report from LBo-R3 with additional<br />

section that compares and demonstrates shading improvements;<br />

� Plan and tabulated results showing achievement of % of shading of applicable<br />

spaces at 1:00pm clock time on the Equinox and Summer Solstice; and<br />

� Extracts from specifications relating to the SRI of all cover elements.<br />

� Updated outdoor thermal comfort strategy including narrative supported by as-built<br />

drawings and photographs of the applicable shade areas, highlighting all measures<br />

contributing to improving the exterior microclimate, including planned or existing<br />

<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 57 of 223

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!