Pearl Building Rating System - Estidama
Pearl Building Rating System - Estidama
Pearl Building Rating System - Estidama
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
IP-2: Innovating Practice<br />
Intent To reward design and construction practices that result in a significant positive impact<br />
in relation to any of the four pillars of <strong>Estidama</strong>.<br />
Credit<br />
Requirements<br />
Awarding Credit<br />
Points<br />
Credit<br />
Submission:<br />
Design <strong>Rating</strong><br />
Credit<br />
Submission:<br />
Construction<br />
<strong>Rating</strong><br />
Calculations and<br />
Methodology<br />
GENERAL<br />
Develop, document and implement an innovative design and/or construction solution<br />
that addresses one or more of the four pillars of <strong>Estidama</strong>.<br />
AND<br />
Develop a guideline document that enables the innovative solution to be repeated.<br />
ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />
None<br />
CREDIT POINTS REQUIREMENTS<br />
2<br />
Design <strong>Rating</strong><br />
(maximum)<br />
2 Innovative solution report.<br />
2<br />
Construction <strong>Rating</strong><br />
(maximum)<br />
Implement the innovative solution, update the innovative<br />
2<br />
solution report and produce guideline documentation.<br />
� Evidence of IDP related to the innovative design and / or construction solution<br />
engaging all relevant team members; and<br />
� Innovative solution report.<br />
� Updated innovative solution report; and<br />
� Guideline Document.<br />
The four pillars that make up the <strong>Estidama</strong> concept are :<br />
� Environmental<br />
� Cultural<br />
� Social<br />
� Economic<br />
The innovative solution must be developed in conjunction with the IDP-R1 Integrated<br />
Development Strategy and be developed into a workable final solution.<br />
An Innovative Solution Report must be prepared that demonstrates the process by<br />
which the final innovative solution has evolved from early concepts and addresses the<br />
following subjects where relevant:<br />
� Detailed narrative of final design solution that must:<br />
o fully describe the design innovation so that it may be repeated;<br />
o be fully supported by concept proofs from studies, experiments or other<br />
research;<br />
o document key parameters relied upon in the context of the project; and<br />
o be fully supported by design drawings, photographs and specifications.<br />
<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 203 of 223