SM-7: <strong>Building</strong> Reuse<br />
Intent To encourage the reuse and improvement of existing building stock, reduce waste and<br />
other environmental impacts associated with new materials extraction, manufacturing,<br />
and transport.<br />
Credit<br />
Requirements<br />
Awarding Credit<br />
Points<br />
Credit<br />
Submission:<br />
Design <strong>Rating</strong><br />
Credit<br />
Submission:<br />
Construction<br />
<strong>Rating</strong><br />
Calculations and<br />
Methodology<br />
GENERAL<br />
References None<br />
Demonstrate that a portion of the building structural system, by surface area, is reused<br />
from an existing building. as follows:<br />
� 1 Credit Point: At least 25% of the building structural system, by surface area, will<br />
be reused.<br />
� 2 Credit Points: At least 50% of the building structural system, by surface area, will<br />
be reused.<br />
ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />
None<br />
CREDIT POINTS REQUIREMENTS<br />
2<br />
(maximum)<br />
1<br />
2<br />
2<br />
(maximum)<br />
1<br />
2<br />
Design <strong>Rating</strong><br />
At least 25% of the building structural system, by surface area,<br />
will be reused.<br />
At least 50% of the building structural system, by surface area,<br />
will be reused.<br />
Construction <strong>Rating</strong><br />
At least 25% of the building structural system, by surface area, is<br />
reused.<br />
At least 50% of the building structural system, by surface area, is<br />
reused.<br />
� Narrative describing how the project intends to meet the Credit Requirements,<br />
including calculations demonstrating the amount of surface area to be reused; and<br />
� Plan drawings of the proposed building and demolition plan of the existing building<br />
demonstrating the amount of surface area to be reused.<br />
� Updated narrative describing how the project meets the Credit Requirements,<br />
including calculations demonstrating the amount of surface area to be reused;<br />
� As-built drawings of the new building and demolition drawings of the existing<br />
building demonstrating the amount of surface area reused; and<br />
� Site photographs illustrating the reuse of the existing structural system.<br />
<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 184 of 223