12.01.2013 Views

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

IDP-3: Construction Environmental Management<br />

Intent To reduce the environmental impacts associated with construction practices.<br />

Credit<br />

Requirements<br />

Awarding Credit<br />

Points<br />

Credit<br />

Submission:<br />

Design <strong>Rating</strong><br />

Credit<br />

Submission:<br />

Construction<br />

<strong>Rating</strong><br />

Calculations and<br />

Methodology<br />

GENERAL<br />

� 1 Credit Point: Demonstrate that the project's Construction Environmental<br />

Management Plan (CEMP) is prepared in accordance with Environment Agency Abu<br />

Dhabi’s Construction Environmental Management Plan Technical Guidance<br />

Document by an EAD-approved and registered consultant and that:<br />

o the Plan has been approved by EAD, for projects required to produce a<br />

CEMP; or<br />

o the Plan has been peer reviewed by an EAD-approved and registered<br />

consultant, for other projects.<br />

� 2 Credit Points: In addition to achieving the above, demonstrate that the project<br />

lead contractor is either ISO 14001 or EHSMS certified.<br />

ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />

None<br />

.<br />

CREDIT POINTS REQUIREMENTS<br />

2<br />

Design <strong>Rating</strong><br />

(maximum)<br />

Develop the CEMP in accordance with Abu Dhabi Environment<br />

1<br />

Agency’s regulations.<br />

1 Project Lead Contractor is ISO 14001 or EHSMS Certified.<br />

2<br />

Construction <strong>Rating</strong><br />

(maximum)<br />

Provide evidence that the CEMP has been properly applied to the<br />

1<br />

site.<br />

Confirm that Project Lead Contractor is ISO 14001 or EHSMS<br />

1<br />

Certified.<br />

� CEMP, including:<br />

� Statement from Environment Agency Abu Dhabi or a suitably qualified peer<br />

reviewer that the project's CEMP meets the Abu Dhabi CEMP standard; and<br />

� CV and EAD-registration of the peer reviewer.<br />

� Certified Contractor’s ISO 14001 or Abu Dhabi EHSMS certification;<br />

� Signed off audit of the CEMP that verifies the project's performance was in<br />

compliance with the CEMP including photographs and narrative of construction<br />

practices; and<br />

� Certified Contractor’s ISO 14001 or Abu Dhabi EHSMS certification.<br />

None<br />

References � Environment Agency Abu Dhabi’s EAD’s Construction Environmental Management<br />

Plan Technical Guidance Document<br />

� ISO 14001 Environmental Management Standard: 2004, International Organization<br />

for Standardization.<br />

� Abu Dhabi Emirate Environment, Health and Safety Management <strong>System</strong> (EHSMS)<br />

www.ead.ae/en/portal/ad.ehsms.aspx<br />

<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 23 of 223

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!