SM-10: Recycled Materials<br />

Intent To increase the demand for recycled materials to reduce the amount of waste going to<br />

disposal.<br />

Credit<br />

Requirements<br />

GENERAL<br />

Demonstrate that recycled materials are used as follows. The credit points listed below<br />

are cumulative.<br />

Recycled Steel<br />

� 1 Credit Point: For Steel-framed <strong>Building</strong>s, at least 50% of all structural steel (by<br />

weight) has a minimum of 25% post-consumer recycled content or is reused OR for<br />

Concrete-framed <strong>Building</strong>s, at least 80% of all reinforcing or stressing steel (by<br />

weight) has a minimum of 90% post-consumer recycled content.<br />

Cement Replacement<br />

Demonstrate through either the use of supplementary cementing materials (SCMs)<br />

(including fly ash, ground granulated blast furnace slag (GGBFS) and silica fumes) or the<br />

increased use of aggregates or admixtures, that the project has reduced the overall<br />

amount of Portland cement used and associated embodied greenhouse gas emissions as<br />

per Table SM 10.1 below.<br />

� 1 Credit Point: Concrete mixes with an embodied GHG as per table SM10.1, rows<br />

B1, C1 and D1<br />

� 2 Credit Points: Concrete mixes with an embodied GHG as per table SM10.1, rows<br />

B2, C2 and D2<br />

Row A<br />

Row B1<br />

Row B2<br />

Table SM 10.1: Embodied Greenhouse Gas Emissions of Concrete<br />

Strength<br />

Grade 25 30 35 40 45 50 55 60<br />

Type<br />

Cast in<br />

Embodied GHG<br />

place<br />

Cast in<br />

162 192 218 240 259 277 292 307<br />

place 121 144 163 179 194 206 218 229<br />

Row C1 Precast 176 209 236 260 281 300 317 332<br />

Row C2 Precast 149 176 199 220 237 253 268 281<br />

Row D1 Stressed 183 217 245 270 292 312 329 345<br />

Row D2 Stressed 162 192 218 240 259 277 292 307<br />

<strong>Estidama</strong><br />

Credits<br />

1 Credit<br />

2 Credits<br />

1 Credit<br />

2 Credits<br />

1 Credit<br />

2 Credits<br />

Recycled Aggregates<br />

� 1 Credit Point: Demonstrate that at least 15% of all aggregates used on site (by<br />

volume), in structural and non-structural applications are recycled.<br />

� 2 Credit Points: Demonstrate that only recycled aggregates and/or aggregates from<br />

industrial waste by-products are used as base, sub-base or backfill.<br />

Other Materials<br />

� 1 Credit Point: Demonstrate that any combination of materials with the following<br />

characteristics constitute at least 10% of the Total Material Costs:<br />

� minimum 30% post-consumer recycled content<br />

� minimum of 80% post-industrial content<br />

� 50% agricultural waste by-product<br />

ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />

None<br />

<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 188 of 223

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!