12.01.2013 Views

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PW-4: Stormwater Management<br />

Intent To minimize peak stormwater discharge and protect the stormwater drainage system<br />

and receiving water bodies from pollutant loading during and after storm events.<br />

Credit<br />

Requirements<br />

GENERAL<br />

Quantity Control<br />

� Demonstrate that the project has developed a stormwater management system<br />

that prioritizes infiltration, sustainable urban drainage systems, and utilizes<br />

structural solutions when necessary.<br />

� 1 Credit Points: Demonstrate that the post-development peak runoff rate and<br />

quantity from the 2-year 24-hour design storm does not exceed the predevelopment<br />

peak run-off rate and quantity through structural methods, or a<br />

combination of both structural and non-structural methods.<br />

� 2 Credit Points: Demonstrate that the post-development peak runoff rate and<br />

quantity from the 2-year 24-hour design storm does not exceed the predevelopment<br />

peak run-off rate and quantity through the use of non-structural<br />

methods only<br />

Quality Control<br />

� 1 Credit Point: The proposed stormwater management system is capable of<br />

collecting and treating a minimum of 90% of stormwater and that the treatment<br />

process is capable of achieving the following minimum standards for quality<br />

control:<br />

� 80% removal of Total Suspended Solids (TSS);<br />

� Minimum 95% removal of litter (gross pollutants, >1mm);<br />

� Minimum 90% removal of hydrocarbons; and<br />

� Use of petrol interceptors or suitable permeable paving for car parks of more<br />

than 4 bays<br />

Operation & Maintenance Plan<br />

� 1 Credit Point: Achieve a minimum of 1 credit point in either Quantity or Quality<br />

Control; and<br />

� Demonstrate that an Operation & Maintenance Plan (OMP) is in place that shows<br />

how all systems will be maintained throughout the life of the development. The<br />

plan should include at a minimum:<br />

� Protocol for maintaining regular system checks and maintenance;<br />

� Methods for ensuring neighboring developments will not be adversely affected<br />

by the project’s stormwater strategy; and<br />

� Strategies to prevent onsite erosion.<br />

ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />

None<br />

<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 135 of 223

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!