PW-4: Stormwater Management<br />
Intent To minimize peak stormwater discharge and protect the stormwater drainage system<br />
and receiving water bodies from pollutant loading during and after storm events.<br />
Credit<br />
Requirements<br />
GENERAL<br />
Quantity Control<br />
� Demonstrate that the project has developed a stormwater management system<br />
that prioritizes infiltration, sustainable urban drainage systems, and utilizes<br />
structural solutions when necessary.<br />
� 1 Credit Points: Demonstrate that the post-development peak runoff rate and<br />
quantity from the 2-year 24-hour design storm does not exceed the predevelopment<br />
peak run-off rate and quantity through structural methods, or a<br />
combination of both structural and non-structural methods.<br />
� 2 Credit Points: Demonstrate that the post-development peak runoff rate and<br />
quantity from the 2-year 24-hour design storm does not exceed the predevelopment<br />
peak run-off rate and quantity through the use of non-structural<br />
methods only<br />
Quality Control<br />
� 1 Credit Point: The proposed stormwater management system is capable of<br />
collecting and treating a minimum of 90% of stormwater and that the treatment<br />
process is capable of achieving the following minimum standards for quality<br />
control:<br />
� 80% removal of Total Suspended Solids (TSS);<br />
� Minimum 95% removal of litter (gross pollutants, >1mm);<br />
� Minimum 90% removal of hydrocarbons; and<br />
� Use of petrol interceptors or suitable permeable paving for car parks of more<br />
than 4 bays<br />
Operation & Maintenance Plan<br />
� 1 Credit Point: Achieve a minimum of 1 credit point in either Quantity or Quality<br />
Control; and<br />
� Demonstrate that an Operation & Maintenance Plan (OMP) is in place that shows<br />
how all systems will be maintained throughout the life of the development. The<br />
plan should include at a minimum:<br />
� Protocol for maintaining regular system checks and maintenance;<br />
� Methods for ensuring neighboring developments will not be adversely affected<br />
by the project’s stormwater strategy; and<br />
� Strategies to prevent onsite erosion.<br />