SM-9: Regional Materials<br />

Intent To encourage the selection of building materials that have reduced transport impacts<br />

and promotes regional economies<br />

Credit<br />

Requirements<br />

Awarding Credit<br />

Points<br />

Credit<br />

Submission:<br />

Design <strong>Rating</strong><br />

Credit<br />

Submission:<br />

Construction<br />

<strong>Rating</strong><br />

GENERAL<br />

Demonstrate that the transport distance traveled by materials, representing a<br />

proportion of the material cost, is not greater than 500 km from the furthest point of<br />

origin to the project site:<br />

� 1 CREDIT POINT = cost of regional materials equivalent to 10% of Total Material<br />

Cost<br />

� 2 CREDIT POINTS = cost of regional materials equivalent to 20% of Total Material<br />

Cost<br />

Any materials sent by airfreight at any point during their transport do not qualify for<br />

this credit.<br />

ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />

None<br />

CREDIT POINTS REQUIREMENTS<br />

2<br />

(maximum)<br />

1<br />

2<br />

2<br />

(maximum)<br />

1<br />

2<br />

Design <strong>Rating</strong><br />

Cost of regional materials specified equal to 10% of Total<br />

Material Cost.<br />

Cost of regional materials specified equal to 20% of Total<br />

Material Cost.<br />

Construction <strong>Rating</strong><br />

Cost of regional materials installed equal to 10% of Total<br />

Material Cost.<br />

Cost of regional materials installed equal to 20% of Total<br />

Material Cost.<br />

� Report listing all materials proposed to demonstrate compliance with the Credit<br />

Requirements, including:<br />

� Their cost;<br />

� location(s) of extraction/harvest/recovery/manufacture;<br />

� distance traveled and means of transport; and<br />

� calculations demonstrating the total amount of the qualifying materials as a<br />

percentage of the total material cost.<br />

� For each nominated material, proof of manufacture detailing country of origin and<br />

port of entry, if applicable; and<br />

� Extracts from specifications indicating the requirement for materials to meet this<br />

credit.<br />

� Updated report listing all nominated materials demonstrating compliance with the<br />

Credit Requirements, including:<br />

� Final cost;<br />

� Location(s) of extract/harvest/recovery/manufacture; and<br />

� proof of manufacture detailing country of origin and port of entry, if<br />

applicable.<br />

� For each nominated material, proof of manufacture detailing country of origin and<br />

port of entry, if applicable; and<br />