SM-13: Improved Construction Waste Management<br />
Intent To further reduce the long-term environmental impacts associated with construction<br />
waste collection, transport and disposal.<br />
Credit<br />
Requirements<br />
Awarding Credit<br />
Points<br />
Credit<br />
Submission:<br />
Design <strong>Rating</strong><br />
Credit<br />
Submission:<br />
Construction<br />
<strong>Rating</strong><br />
Calculations and<br />
Methodology<br />
GENERAL<br />
� 1 Credit Point: Demonstrate that the Contractor implemented monthly monitoring<br />
of the CDWMP, and achieved a minimum final recycling/salvage rate of 50% of<br />
construction and demolition waste (by weight or volume). This figure excludes all<br />
hazardous waste that must undergo specialized treatment<br />
� 2 Credit Points: Demonstrate that the Contractor implemented monthly monitoring<br />
of the CDWMP, and achieved a minimum final recycling/salvage rate of 70% of<br />
construction and demolition waste (by weight or volume). This figure excludes all<br />
hazardous waste that must undergo specialized treatment<br />
ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />
None<br />
CREDIT POINTS REQUIREMENTS<br />
2<br />
(maximum)<br />
1<br />
2<br />
2<br />
(maximum)<br />
1<br />
2<br />
Design <strong>Rating</strong><br />
Demonstrate CDWMP aims for a minimum of 50% demolition<br />
and construction waste (by weight or volume) to be recycled<br />
/ salvaged.<br />
Demonstrate CDWMP aims for a minimum of 70% demolition<br />
and construction waste (by weight or volume) to be recycled<br />
/ salvaged.<br />
Construction <strong>Rating</strong><br />
Confirm a minimum of 50% of demolition and construction waste<br />
(by weight or volume) was recycled/salvaged.<br />
Confirm a minimum of 70% of demolition and construction waste<br />
(by weight or volume) was recycled/salvaged.<br />
� CDWMP conforming to the Credit Requirements; and<br />
� Schedule of items to be recycled/salvaged, their source within the project, their<br />
total estimated weight or volume and the name and location of potential<br />
reclaim/recycling haulers.<br />
� Calculations supported with detailed receipts, summarizing final results of the<br />
CDWMP listing items recycled/salvaged, their source within the project, their total<br />
weight or volume, the name and location of the reclaim/recycling haulers, and<br />
markets for the recyclable materials.<br />
Calculations can be done by weight or volume but must be consistent throughout.<br />
References � Centre of Waste Management, Abu Dhabi: www.cwm.ae<br />