SM-13: Improved Construction Waste Management<br />

Intent To further reduce the long-term environmental impacts associated with construction<br />

waste collection, transport and disposal.<br />

Credit<br />

Requirements<br />

Awarding Credit<br />

Points<br />

Credit<br />

Submission:<br />

Design <strong>Rating</strong><br />

Credit<br />

Submission:<br />

Construction<br />

<strong>Rating</strong><br />

Calculations and<br />

Methodology<br />

GENERAL<br />

� 1 Credit Point: Demonstrate that the Contractor implemented monthly monitoring<br />

of the CDWMP, and achieved a minimum final recycling/salvage rate of 50% of<br />

construction and demolition waste (by weight or volume). This figure excludes all<br />

hazardous waste that must undergo specialized treatment<br />

� 2 Credit Points: Demonstrate that the Contractor implemented monthly monitoring<br />

of the CDWMP, and achieved a minimum final recycling/salvage rate of 70% of<br />

construction and demolition waste (by weight or volume). This figure excludes all<br />

hazardous waste that must undergo specialized treatment<br />

ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />

None<br />

CREDIT POINTS REQUIREMENTS<br />

2<br />

(maximum)<br />

1<br />

2<br />

2<br />

(maximum)<br />

1<br />

2<br />

Design <strong>Rating</strong><br />

Demonstrate CDWMP aims for a minimum of 50% demolition<br />

and construction waste (by weight or volume) to be recycled<br />

/ salvaged.<br />

Demonstrate CDWMP aims for a minimum of 70% demolition<br />

and construction waste (by weight or volume) to be recycled<br />

/ salvaged.<br />

Construction <strong>Rating</strong><br />

Confirm a minimum of 50% of demolition and construction waste<br />

(by weight or volume) was recycled/salvaged.<br />

Confirm a minimum of 70% of demolition and construction waste<br />

(by weight or volume) was recycled/salvaged.<br />

� CDWMP conforming to the Credit Requirements; and<br />

� Schedule of items to be recycled/salvaged, their source within the project, their<br />

total estimated weight or volume and the name and location of potential<br />

reclaim/recycling haulers.<br />

� Calculations supported with detailed receipts, summarizing final results of the<br />

CDWMP listing items recycled/salvaged, their source within the project, their total<br />

weight or volume, the name and location of the reclaim/recycling haulers, and<br />

markets for the recyclable materials.<br />

Calculations can be done by weight or volume but must be consistent throughout.<br />

References � Centre of Waste Management, Abu Dhabi: www.cwm.ae<br />