12.01.2013 Views

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Credit<br />

Submission:<br />

Construction<br />

<strong>Rating</strong><br />

Calculations<br />

and<br />

Methodology<br />

� Spreadsheet listing as per LBi-5.1 highlighting zonal indoor operative temperatures<br />

during natural ventilation period. Zoning information provided must match the<br />

information provided in Credit LBi-5.1 Thermal Zoning.<br />

Submission of spreadsheet results and associated plans for ‘typical floors’ will only be<br />

accepted where equivalency can be demonstrated.<br />

Mechanical Ventilation Period of Operation<br />

� Brief narrative describing how the project meets the Credit Requirements;<br />

� As-Built Plan Drawings of the mechanical ventilation systems, clearly indicating zone<br />

boundaries and zone references;<br />

� Screen shots of simulation model Thermal Zones; and<br />

� Spreadsheet listing as per LBi-5.1 augmented with PMV and PPD results from<br />

simulations. Note that zones must match the information provided in Credit LBi-5.1<br />

Thermal Zoning.<br />

Mixed-mode Ventilation Period of Operation<br />

� Brief narrative describing how the project meets the Credit Requirements including<br />

discussion on period of year intended for natural ventilation, mean monthly<br />

temperatures during this period, window control strategy and tables of opening area<br />

per window type;<br />

� As-Built Elevation drawings highlighting extent of operable window typologies used per<br />

façade;<br />

� As-Built Section drawings for each operable window typology showing maximum<br />

window opening position for each operable window type; and<br />

� Spreadsheet listing as per LBi-5.1 highlighting zonal indoor operative temperatures<br />

during natural ventilation period. Zoning information provided must match the<br />

information provided in Credit LBi-5.1 Thermal Zoning.<br />

Submission of spreadsheet results and associated plans for ‘typical floors’ will only be<br />

accepted where equivalency can be demonstrated.<br />

Dynamic Simulation Modeling (DSM) software must be capable of hourly simulations<br />

covering a period 8,760 hours.<br />

For DSM software incapable of calculating PMV / PPD, designers may use equations 1 to 5<br />

of EN ISO 7730 to establish these values from DSM results. For spaces served by fully mixed<br />

all air systems, such as provided by Fan Coil Units or Variable Air Volume systems, in which<br />

the relative humidity is centered on 50% +/- 10% and the air speed can be assumed to be<br />

less than 0.1ms -1 use figure A1 for the relevant category being pursued in conjunction with<br />

DSM results.<br />

Consideration must be given to appropriate metabolic rates and clothing indices for the<br />

intended space usage and mix of local and western attires.<br />

For sedentary activities, such as for desk based office workers, inclusion of thermal<br />

insulation associated with ‘standard office chairs’ (as per Table C.3) must also be included<br />

in the clothing index unless it can be proven that other types such as ‘net/metal chairs’<br />

will be installed.<br />

References � EN ISO 7730 : 2005 “Ergonomics of the thermal environment – Analytical determination<br />

and interpretation of thermal comfort using calculation of the PMV and PPD indices<br />

and local thermal comfort criteria”, www.bsigroup.com<br />

� ASHRAE 55-2004, “Thermal Environmental Conditions for Human Occupancy”,<br />

www.ashrae.org<br />

<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 103 of 223

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!