References None<br />

� Predicted impact in relation to the four pillars of <strong>Estidama</strong>: The final design<br />

solution should be contextualized in terms of tangible impacts against one or more<br />

of the four pillars;<br />

� Feasibility studies: This must address documented design evolution decisions<br />

toward the final design solution and address any and all considerations that lead to<br />

the final solution;<br />

� Cost Benefit Analysis: A detailed cost benefit analysis of the design measure(s)<br />

including, at a minimum, capital cost, operational and maintenance cost, cost as a<br />

percentage of total project cost and revenue where appropriate. The benefit<br />

analysis must include performance targets / levels attained or anticipated to be<br />

attained as a direct result of the measures;<br />

� Risk: The risk analysis must detail the framework within which the design solution<br />

is intended to work and highlight any and all weaknesses that would impede<br />

performance. The analysis must anticipate the impact of such weaknesses on the<br />

performance of the design solution;<br />

� Integration and Implementation: This section must clearly demonstrate how the<br />

design solution has been integrated with any and all related elements associated<br />

with the development as well as a detailed plan of how the design solution is<br />

implemented;<br />

� Measurability: This section must address how the performance of the design<br />

solution will be measured in-use and include all metrics and associated<br />

technologies relied upon; and<br />

� Maintainability and Durability: This section must address all maintenance and<br />

durability aspects related to the design solution.<br />

Awarding innovative credit points are subject to <strong>Estidama</strong> approval.<br />