NS-2: Remediation of Contaminated Land<br />

Intent To encourage and promote the remediation of land for building development.<br />

Credit<br />

Requirements<br />

Awarding Credit<br />

Points<br />

Credit<br />

Submission:<br />

Design <strong>Rating</strong><br />

Credit<br />

Submission:<br />

Construction<br />

<strong>Rating</strong><br />

GENERAL<br />

Demonstrate the site is contaminated by undertaking an investigative analysis through<br />

completion of a Phase I and Phase II American Society for Testing and Materials (ASTM)<br />

analysis, or similar. A Site Contamination Assessment Report must be provided<br />

identifying, estimating and evaluating the hazard risks on site. Demonstrate that the<br />

results of the Contamination Assessment Report have informed the overall design and<br />

layout of the development.<br />

Demonstrate that adequate remedial steps will be taken to decontaminate, or safely<br />

encapsulate, the site prior to construction through a Phase III ASTM report, or similar.<br />

The remediation strategy must be suitable for the proposed land use. The report must<br />

state the scope of engagement, the person or organization responsible for overseeing<br />

the decontamination operation (from commencement to completion) and confirm that<br />

the site will be appropriately remediated for the proposed land uses.<br />

All assessments, analysis and reporting must be carried out by a suitably qualified<br />

professional trained to complete such analysis and assessment.<br />

ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />

None<br />

CREDIT POINTS REQUIREMENTS<br />

2<br />

(maximum)<br />

2<br />

2<br />

(maximum)<br />

2<br />

Design <strong>Rating</strong><br />

Demonstrate the site is contaminated and an assessment report<br />

and remediation strategy has been prepared.<br />

Construction <strong>Rating</strong><br />

Demonstrate that the land, prior to development, was identified<br />

as contaminated through the site contamination assessment<br />

report and that adequate remedial steps were taken to<br />

decontaminate or safely encapsulate the site prior to<br />

construction.<br />

� Site contamination assessment report that clearly documents the pre-existing<br />

contamination on site; and<br />

� Certificate of engagement and Phase III remediation strategy from a suitably<br />

qualified professional.<br />

� Site contamination assessment report that clearly documents the pre-existing<br />

contamination on site; and<br />

� Validation report of remediation from a suitably qualified professional. The report<br />

must state who was responsible for overseeing the remediation operations (from<br />

commencement to completion) and confirm that the site has been correctly and<br />

appropriately remediated for the proposed land use.<br />

<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 42 of 223

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!