NS-2: Remediation of Contaminated Land<br />
Intent To encourage and promote the remediation of land for building development.<br />
Credit<br />
Requirements<br />
Awarding Credit<br />
Points<br />
Credit<br />
Submission:<br />
Design <strong>Rating</strong><br />
Credit<br />
Submission:<br />
Construction<br />
<strong>Rating</strong><br />
GENERAL<br />
Demonstrate the site is contaminated by undertaking an investigative analysis through<br />
completion of a Phase I and Phase II American Society for Testing and Materials (ASTM)<br />
analysis, or similar. A Site Contamination Assessment Report must be provided<br />
identifying, estimating and evaluating the hazard risks on site. Demonstrate that the<br />
results of the Contamination Assessment Report have informed the overall design and<br />
layout of the development.<br />
Demonstrate that adequate remedial steps will be taken to decontaminate, or safely<br />
encapsulate, the site prior to construction through a Phase III ASTM report, or similar.<br />
The remediation strategy must be suitable for the proposed land use. The report must<br />
state the scope of engagement, the person or organization responsible for overseeing<br />
the decontamination operation (from commencement to completion) and confirm that<br />
the site will be appropriately remediated for the proposed land uses.<br />
All assessments, analysis and reporting must be carried out by a suitably qualified<br />
professional trained to complete such analysis and assessment.<br />
ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />
None<br />
CREDIT POINTS REQUIREMENTS<br />
2<br />
(maximum)<br />
2<br />
2<br />
(maximum)<br />
2<br />
Design <strong>Rating</strong><br />
Demonstrate the site is contaminated and an assessment report<br />
and remediation strategy has been prepared.<br />
Construction <strong>Rating</strong><br />
Demonstrate that the land, prior to development, was identified<br />
as contaminated through the site contamination assessment<br />
report and that adequate remedial steps were taken to<br />
decontaminate or safely encapsulate the site prior to<br />
construction.<br />
� Site contamination assessment report that clearly documents the pre-existing<br />
contamination on site; and<br />
� Certificate of engagement and Phase III remediation strategy from a suitably<br />
qualified professional.<br />
� Site contamination assessment report that clearly documents the pre-existing<br />
contamination on site; and<br />
� Validation report of remediation from a suitably qualified professional. The report<br />
must state who was responsible for overseeing the remediation operations (from<br />
commencement to completion) and confirm that the site has been correctly and<br />
appropriately remediated for the proposed land use.<br />
<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 42 of 223