LBi-1: Ventilation Quality<br />
Intent To promote the provision of building systems that support the wellbeing and comfort of<br />
occupants by providing sufficient outside air ventilation.<br />
Credit<br />
Requirements<br />
Awarding<br />
Credit Points<br />
GENERAL<br />
Demonstrate that all of the occupied areas meet the following, as appropriate for the<br />
type of ventilation:<br />
Mechanical Ventilation<br />
� 1 Credit Point: Install permanent carbon dioxide (CO2) monitoring and alert systems<br />
to ensure the adequate provision of outside air at all times. At a minimum, one CO2<br />
sensor must be installed at each return point. The CO2 level must not be allowed to<br />
exceed 1000ppm.<br />
� 1 Credit Point: After achieving the above credit point, demonstrate an increase in<br />
outdoor air ventilation of 15% above the outdoor air ventilation rates established in<br />
LBi-R1.<br />
Mixed Mode Ventilation<br />
� 1 Credit Point:<br />
o Comply with the Credit Requirement for CO2 monitoring and alert systems for<br />
mechanically ventilated buildings (above) for the period when the building is<br />
in air conditioned mode; and<br />
o Ensure the CO2 monitoring system has sensors located in the breathing zone<br />
and is capable of alerting occupants when additional fresh air is required. At<br />
a minimum CO2 levels must not exceed 1000ppm; and<br />
o Undertake dynamic simulation modeling (DSM) for the natural ventilation<br />
period of operation, to demonstrate the effectiveness of the operable<br />
window open areas in terms of thermal comfort (as defined for Mixed Mode<br />
buildings in LBi-5.3 Thermal Comfort Modelling), internal CO2 levels and<br />
ventilation rates. Guidance from CIBSE AM10:2005 must be followed for all<br />
natural ventilation strategies. Where a project is located in or has a form<br />
that precludes the assumptions of standard tabulated pressure coefficients<br />
across ventilation openings, the DSM model must be augmented with the<br />
results of either wind tunnel or Computational Fluid Dynamics (CFD)<br />
modeling to establish appropriate pressure coefficients at façade openings.<br />
ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />
None<br />
.<br />
.<br />
CREDIT POINTS REQUIREMENTS<br />
3<br />
Design <strong>Rating</strong><br />
(maximum)<br />
1 CO2 sensors at all return points<br />
1 Ventilation exceeds minimum requirements by 15%<br />
1 Mixed Mode Operation (not available to retail use type)<br />
3<br />
Construction <strong>Rating</strong><br />
(maximum)<br />
1 CO2 sensors at all return points<br />
1 Ventilation exceeds minimum requirements by 15%<br />
1 Mixed Mode Operation (not available to retail use type)<br />