12.01.2013 Views

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LBi-R1: Healthy Ventilation Delivery<br />

Intent To protect the quality of air drawn into buildings for ventilation and to ensure minimum<br />

delivery of outdoor fresh air.<br />

Credit<br />

Requirements<br />

Requirement<br />

Achievement<br />

Credit<br />

Submission:<br />

Design <strong>Rating</strong><br />

Credit<br />

Submission:<br />

Construction<br />

<strong>Rating</strong><br />

Calculations and<br />

Methodology<br />

GENERAL<br />

Undertake and document an observational survey of local air quality according to<br />

sections 4.2 and 4.3 of ASHRAE 62.1.2007.<br />

Demonstrate that the building mechanical system meets the following requirements:<br />

� Separation distances between outdoor air intakes and any exhausts or discharge<br />

points comply with ASHRAE 62.1.2007 or local code whichever is more stringent;<br />

� All exhausts are located outside of the defined public realm or as defined by local<br />

code, whichever is more stringent; and<br />

� Demonstrate that all of the occupied areas in the building comply with the minimum<br />

thresholds set out in ASHRAE 62.1:2007 using the ventilation rate procedure or local<br />

code, whichever is more stringent.<br />

ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />

None<br />

This is a requirement. There are no Credit Points awarded.<br />

� Documentation of an observational study of local air quality including photographs<br />

of surrounding sources of pollutant emissions;<br />

� Mechanical system drawings marked-up to clearly show distances between air intake<br />

points and exhaust air or other discharge points and the distances from the air<br />

exhaust points to any defined public realm areas;<br />

� Narrative describing how the mechanical design system meets the Credit<br />

Requirements, including description of mechanical ventilation system; and<br />

� Spreadsheet calculations of fresh air ventilation rates based on the ventilation rate<br />

procedure for all zones.<br />

� As-built mechanical system drawings marked-up to clearly show distances between<br />

air intake points and exhaust air or other discharge points and the distances from<br />

the air exhaust points to any defined public realm areas;<br />

� Narrative describing how the mechanical design system meets the Credit<br />

Requirements, including description of mechanical ventilation system; and<br />

� Commissioning results demonstrating compliance with minimum fresh air ventilation<br />

rate requirements.<br />

The calculation process to determine minimum fresh air rates for various space usage<br />

types are documented in the reference standard.<br />

References � ASHRAE 62.1.2007 “Ventilation for Acceptable Indoor Air Quality”, www.ashrae.org<br />

<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 76 of 223

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!