12.01.2013 Views

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Credit<br />

Submission:<br />

Construction<br />

<strong>Rating</strong><br />

Calculations and<br />

Methodology<br />

the overall landscaping plan;<br />

� <strong>System</strong> specifications including cut sheets and/or manufacturer’s specifications<br />

for the following equipment:<br />

� Override sensors;<br />

� Backflow valves; and<br />

� Separate meters.<br />

� Drawings showing the location of each device on a site plan.<br />

Recycled Water<br />

� Completed <strong>Building</strong> Water Calculator confirming that 100% of the exterior irrigation<br />

demand can be served using the Exterior Water Allowance; and<br />

� A composite utility schematic illustrating routing of recycled water mainline and<br />

laterals.<br />

Schools Only<br />

� Confirmation that all playing fields use turf substitutes requiring no irrigation<br />

water;<br />

� Site plans indicating location and size of playing fields; and<br />

� Specification/manufacturer’s details of turf substitutes.<br />

� Revised As-Built documentation as per Design <strong>Rating</strong>; and<br />

� Photographs of the installed irrigation systems, landscaping, school playing fields<br />

(where applicable), water recycling systems (where installed) and routing of<br />

recycled water mainline and laterals indicating their color code.<br />

Plant Selection<br />

� Landscaped area refers to the plot area excluding the building footprint and all<br />

water feature / swimming pool areas, and is made up of all hardscape and<br />

softscape areas. Where communal rooftop amenities are provided (e.g.<br />

podium/skylight gardens), any landscape associated with these spaces must also be<br />

included in the calculation.<br />

The average irrigation demand for all landscaped areas is calculated as follows:<br />

AP = Plot Area,<br />

AB = <strong>Building</strong> Footprint Area,<br />

AS = Softscape Area (grade level)<br />

AW = Water Feature/Swimming Pool Area (grade level),<br />

ARA = Roof Amenity Area<br />

ARS = Softscape Area (roof level),<br />

ARW = Water Feature/Swimming Pool Area (roof level)<br />

<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 125 of 223

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!