Awarding Credit<br />
Points<br />
Credit<br />
Submission:<br />
Design <strong>Rating</strong><br />
Credit<br />
Submission:<br />
Construction<br />
<strong>Rating</strong><br />
.<br />
CREDIT POINTS REQUIREMENTS<br />
4<br />
(maximum)<br />
1<br />
1<br />
1<br />
1<br />
4<br />
(maximum)<br />
1<br />
1<br />
1<br />
1<br />
Design <strong>Rating</strong><br />
Demonstrate that the weighted average of all refrigerants shall<br />
have a GWP of 10 or less.<br />
Demonstrate that a permanent refrigerant leak detection system<br />
shall be installed.<br />
Demonstrate that an automatic refrigerant pump down system<br />
shall be installed.<br />
Demonstrate that 100% of gaseous fire systems shall have a GWP<br />
of 1 or less.<br />
Construction <strong>Rating</strong><br />
Demonstrate that the weighted average of all refrigerants has a<br />
GWP of 10 or less.<br />
Demonstrate that a permanent refrigerant leak detection system<br />
has been installed.<br />
Demonstrate that an automatic refrigerant pump down system<br />
has been installed.<br />
Demonstrate that 100% of gaseous fire systems have a GWP of 1<br />
or less.<br />
� Narrative and calculations (if applicable) describing how the project meets the<br />
credit requirements, and specific requirements as below:<br />
Refrigerants<br />
� Specification extracts for all proposed refrigerants confirming the GWP of each<br />
refrigerant.<br />
Refrigerant Leak Detection<br />
� <strong>System</strong> specifications for the leak detection system.<br />
Refrigerant Pump Down<br />
� Specification detailing the type and operation of the automatic refrigerant pump<br />
down system.<br />
Fire Suppression <strong>System</strong>s<br />
� Extracts from specifications confirming the GWP of all proposed gaseous fire<br />
suppression systems.<br />
� Updated narrative and calculations (if applicable) describing how the project meets<br />
the credit requirements, and specific requirements as below:<br />
Refrigerants<br />
� Manufacturer’s information for all installed refrigerants confirming the GWP of<br />
each refrigerant.<br />
Refrigerant Leak Detection<br />
� Manufacturer’s information for installed leak detection system; and<br />
� Extract from IDP-R4 Basic Commissioning report verifying the individual Leak<br />
Detection system operates as intended.<br />
Refrigerant Pump Down<br />
� Manufacturer’s information detailing the type and operation of the automatic<br />
refrigerant pump down system; and<br />
� Extract from IDP-R4 Basic Commissioning report verifying the refrigerant pump<br />
down system operates as intended.<br />
Fire Suppression <strong>System</strong>s<br />
� Manufacturer’s information confirming the GWP of all installed gaseous fire<br />
suppression systems.<br />
<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 167 of 223