Awarding Credit<br />

Points<br />

Credit<br />

Submission:<br />

Design <strong>Rating</strong><br />

Credit<br />

Submission:<br />

Construction<br />

<strong>Rating</strong><br />

.<br />

CREDIT POINTS REQUIREMENTS<br />

4<br />

(maximum)<br />

1<br />

1<br />

1<br />

1<br />

4<br />

(maximum)<br />

1<br />

1<br />

1<br />

1<br />

Design <strong>Rating</strong><br />

Demonstrate that the weighted average of all refrigerants shall<br />

have a GWP of 10 or less.<br />

Demonstrate that a permanent refrigerant leak detection system<br />

shall be installed.<br />

Demonstrate that an automatic refrigerant pump down system<br />

shall be installed.<br />

Demonstrate that 100% of gaseous fire systems shall have a GWP<br />

of 1 or less.<br />

Construction <strong>Rating</strong><br />

Demonstrate that the weighted average of all refrigerants has a<br />

GWP of 10 or less.<br />

Demonstrate that a permanent refrigerant leak detection system<br />

has been installed.<br />

Demonstrate that an automatic refrigerant pump down system<br />

has been installed.<br />

Demonstrate that 100% of gaseous fire systems have a GWP of 1<br />

or less.<br />

� Narrative and calculations (if applicable) describing how the project meets the<br />

credit requirements, and specific requirements as below:<br />

Refrigerants<br />

� Specification extracts for all proposed refrigerants confirming the GWP of each<br />

refrigerant.<br />

Refrigerant Leak Detection<br />

� <strong>System</strong> specifications for the leak detection system.<br />

Refrigerant Pump Down<br />

� Specification detailing the type and operation of the automatic refrigerant pump<br />

down system.<br />

Fire Suppression <strong>System</strong>s<br />

� Extracts from specifications confirming the GWP of all proposed gaseous fire<br />

suppression systems.<br />

� Updated narrative and calculations (if applicable) describing how the project meets<br />

the credit requirements, and specific requirements as below:<br />

Refrigerants<br />

� Manufacturer’s information for all installed refrigerants confirming the GWP of<br />

each refrigerant.<br />

Refrigerant Leak Detection<br />

� Manufacturer’s information for installed leak detection system; and<br />

� Extract from IDP-R4 Basic Commissioning report verifying the individual Leak<br />

Detection system operates as intended.<br />

Refrigerant Pump Down<br />

� Manufacturer’s information detailing the type and operation of the automatic<br />

refrigerant pump down system; and<br />

� Extract from IDP-R4 Basic Commissioning report verifying the refrigerant pump<br />

down system operates as intended.<br />

Fire Suppression <strong>System</strong>s<br />

� Manufacturer’s information confirming the GWP of all installed gaseous fire<br />

suppression systems.<br />

<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 167 of 223