Credit<br />

Submission:<br />

Construction<br />

<strong>Rating</strong><br />

Calculations and<br />

Methodology<br />

percentage of the proposed building annual energy consumption.<br />

Offsite <strong>System</strong>s:<br />

� Calculations demonstrating the amount of renewable energy required to be<br />

purchased in order to achieve 20% of the project’s non-renewable energy<br />

consumption from offsite renewable generation; and<br />

� Narrative describing the proposed strategy (direct purchase/RECs) for achieving the<br />

credit requirements.<br />

Onsite <strong>System</strong>s:<br />

� Photographic evidence confirming that the recommended renewable energy<br />

technology/technologies based on the design stage feasibility study has been<br />

incorporated into the project; and<br />

� Updated summary report showing the annual energy generation capability of each<br />

installed renewable energy technology, both in terms of annual energy produced as<br />

well as a percentage of the proposed building annual energy consumption.<br />

Offsite <strong>System</strong>s:<br />

� Direct Purchase<br />

� The name of the renewable energy provider;<br />

� Annual quantity of renewable energy purchases;<br />

� Renewable energy technology (e.g. solar photovoltaics);<br />

� Confirmation that the annual purchases are equal to 20% or more of the<br />

proposed building’s annual non-renewable energy consumption; and<br />

� Copy of the contract verifying the annual purchase amount and length of<br />

contract.<br />

� Renewable Energy Certificates (RECs)<br />

� Narrative describing the proposed purchase plan for RECs;<br />

� The annual quantity of purchases;<br />

� Renewable energy technology (e.g. solar photovoltaics);<br />

� Confirmation that the annual purchases are equal to 20% or more of the<br />

proposed building’s annual non-renewable energy consumption;<br />

� Copy of the contract verifying the annual purchase amount and length of<br />

contract; and<br />

� Approved certification (e.g. Green-e certified).<br />

� Combination of Direct Purchase and RECs<br />

� Documentation required above for both Direct Purchase and RECs; and<br />

� Narrative confirming that the combined annual purchase is equal to 20% or<br />

more of the proposed building’s annual energy consumption.<br />

Eligible renewable technologies include, but are not limited to:<br />

� Wind energy systems;<br />

� Solar energy, including solar electricity and solar thermal systems;<br />

� Deep-heat geothermal systems, providing either electrical power or thermal energy<br />

(does not include ground source heat pumps);<br />

� Wave/tidal/hydro electric energy systems;<br />

� Landfill gas systems; and<br />

� Organic/agricultural and animal waste to energy systems.<br />

Any other form of renewable technology may be proposed and will be subject to<br />

approval from <strong>Estidama</strong>.<br />

Onsite <strong>System</strong>s:<br />

Onsite systems are defined as renewable energy generated within the project site<br />

boundary.<br />

The onsite renewable energy feasibility study must cover a minimum of three<br />

<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 164 of 223