Credit<br />
Submission:<br />
Construction<br />
<strong>Rating</strong><br />
Calculations and<br />
Methodology<br />
percentage of the proposed building annual energy consumption.<br />
Offsite <strong>System</strong>s:<br />
� Calculations demonstrating the amount of renewable energy required to be<br />
purchased in order to achieve 20% of the project’s non-renewable energy<br />
consumption from offsite renewable generation; and<br />
� Narrative describing the proposed strategy (direct purchase/RECs) for achieving the<br />
credit requirements.<br />
Onsite <strong>System</strong>s:<br />
� Photographic evidence confirming that the recommended renewable energy<br />
technology/technologies based on the design stage feasibility study has been<br />
incorporated into the project; and<br />
� Updated summary report showing the annual energy generation capability of each<br />
installed renewable energy technology, both in terms of annual energy produced as<br />
well as a percentage of the proposed building annual energy consumption.<br />
Offsite <strong>System</strong>s:<br />
� Direct Purchase<br />
� The name of the renewable energy provider;<br />
� Annual quantity of renewable energy purchases;<br />
� Renewable energy technology (e.g. solar photovoltaics);<br />
� Confirmation that the annual purchases are equal to 20% or more of the<br />
proposed building’s annual non-renewable energy consumption; and<br />
� Copy of the contract verifying the annual purchase amount and length of<br />
contract.<br />
� Renewable Energy Certificates (RECs)<br />
� Narrative describing the proposed purchase plan for RECs;<br />
� The annual quantity of purchases;<br />
� Renewable energy technology (e.g. solar photovoltaics);<br />
� Confirmation that the annual purchases are equal to 20% or more of the<br />
proposed building’s annual non-renewable energy consumption;<br />
� Copy of the contract verifying the annual purchase amount and length of<br />
contract; and<br />
� Approved certification (e.g. Green-e certified).<br />
� Combination of Direct Purchase and RECs<br />
� Documentation required above for both Direct Purchase and RECs; and<br />
� Narrative confirming that the combined annual purchase is equal to 20% or<br />
more of the proposed building’s annual energy consumption.<br />
Eligible renewable technologies include, but are not limited to:<br />
� Wind energy systems;<br />
� Solar energy, including solar electricity and solar thermal systems;<br />
� Deep-heat geothermal systems, providing either electrical power or thermal energy<br />
(does not include ground source heat pumps);<br />
� Wave/tidal/hydro electric energy systems;<br />
� Landfill gas systems; and<br />
� Organic/agricultural and animal waste to energy systems.<br />
Any other form of renewable technology may be proposed and will be subject to<br />
approval from <strong>Estidama</strong>.<br />
Onsite <strong>System</strong>s:<br />
Onsite systems are defined as renewable energy generated within the project site<br />
boundary.<br />
The onsite renewable energy feasibility study must cover a minimum of three<br />
<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 164 of 223