14.1.6 RESOURCE B LOCK MODEL<br />

Individual block models were established in Datamine for both zones using one<br />

parent model as the origin; the model was not rotated.<br />

Drillhole spacing varies, though the majority of the surface drilling is spaced at 50 to<br />

100 m sections. The underground drilling on the East Zone is spaced at 15 to 20 m,<br />

but only targeted the mineralization along the footwall. A block size of 20 m x 10 m x<br />

20 m was selected in order to ac<strong>com</strong>modate the nature of the mineralization and the<br />

open pit potential.<br />

Sub-celling of the block model on a 1 x 1 x 1 pattern allows the parent block to be<br />

split once in each direction to fill the volume of the wireframes more accurately, and<br />

thus estimate the tonnage in the resource more accurately.<br />

Table 14.8 summarizes details of the parent block model.<br />

Table 14.8 Parent Block Model<br />

Origin Cell Size Number of Cells<br />

X Origin Y Origin Z Origin XINC YINC ZINC NX NY NZ<br />

1000 14500 300 20 10 20 165 150 85<br />

The interpolations of the two zones were <strong>com</strong>pleted using the estimation methods:<br />

NN, inverse distance squared (ID 2 ) and OK. The estimations were designed for<br />

three passes. A minimum and maximum number of samples were required in each<br />

pass, as well as a maximum number of samples from a borehole in order to satisfy<br />

the estimation criteria. Table 14.9 and Table 14.10 summarizes the interpolation<br />

criteria for the two zones.<br />

Prophecy Platinum Corp. 14-8 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!