ond work indices generated through laboratory test work at Lakefield. The<br />

connected loads for the other process equipment were taken from the InfoMine<br />

Estimator’s guide.<br />

The labour cost was determined by <strong>com</strong>piling a list of the required <strong>com</strong>pliment for the<br />

process plant. Salaries were taken from the InfoMine, Canadian Mine Salaries<br />

Wages & Benefits – 2010 Survey Results. Adjustments were made for 2011 dollars.<br />

A summary of the consumables, labour, and electrical power costs, as well as the<br />

total operating cost, is shown in Table 21.14. The operating costs are based on a<br />

32,000 t/d mill throughput.<br />

Table 21.14 Process Operating Costs<br />

US$/t milled<br />

Annual Cost<br />

(US$)<br />

Percentage<br />

(%)<br />

Electrical Power 8.14 91,157,689 47<br />

Labour 0.68 7,569,050 4<br />

Consumables 8.53 95,545,544 49<br />

Grand Total 17.35 194,272,283 100<br />

Prophecy Platinum Corp. 21-16 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!