17.2 P ROCESS D ESIGN C RITERIA<br />

The design criteria have been based on the previous laboratory work <strong>com</strong>pleted by<br />

Lakefield (et al.), G&T and the latest program at SGS (refer to Appendix C for SGS’s<br />

report). The key items have been listed in Table 17.1.<br />

Table 17.1 Process Design Criteria<br />

Criteria Measurement<br />

Throughput<br />

Mill Availability 95%<br />

Operating Days 350<br />

Annual Throughput 11,200,000 t/a<br />

Daily Throughput 32,000 t/d<br />

Hourly Throughput 1,334 t/h<br />

Hourly Throughput per Train 667 t/h<br />

Feed Grade, Ni 0.32%<br />

Feed Grade, Cu 0.26%<br />

Feed Grade, Co 0.02%<br />

Feed Grade, Pt 0.41 g/t<br />

Feed Grade, Pd 0.35 g/t<br />

Feed Grade, Au 0.18 g/t<br />

Mineralized Material SG 3.22 t/m 3<br />

Grind<br />

Abrasion Index (Ai) 0.088<br />

SAG Recirculating Load 15%<br />

SAG Feed Size -340 mm<br />

SAG Transfer Size, T80 1,000 µm<br />

Ball Mill Work Index (BWi) 19.7 kWh/t<br />

Ball Mill Product Size, P80 74 µm<br />

Ball Mill Recirculating Load 250%<br />

Vertimill Product Size<br />

Float<br />

45 µm<br />

Collector SIPX<br />

Frother MIBC<br />

Modifier CMC<br />

Note: SIPX = sodium isopropyl xanthate; MIBC = methyl isobutyl carbinol; CMC =<br />

carboxymethyl cellulose<br />

Prophecy Platinum Corp. 17-4 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!