Mine Operations<br />

Position No.<br />

Annual Cost<br />

Per Person<br />

(Cdn$)<br />

Total Annual<br />

Cost<br />

(Cdn$)<br />

Cost<br />

(Cdn$/t<br />

mined)<br />

Cost<br />

Cdn$/t<br />

milled)<br />

Drill Operator 6 98,500 591,000 - -<br />

Drill Helper 4 92,500 370,000 - -<br />

Blaster 4 108,200 432,800 - -<br />

Blaster Helper 4 92,500 370,000 - -<br />

Shovel Operator 11 108,200 1,190,200 - -<br />

Loader Operator 4 98,500 394,000 - -<br />

Haul-Truck Operator 58 95,500 5,539,000 - -<br />

Dozer Operator 24 98,500 2,364,000 - -<br />

Grader Operator 11 98,500 1,083,500 - -<br />

Backhoe Excavator Operator 4 98,500 394,000 - -<br />

Water Truck Operator 4 98,500 394,000 - -<br />

Fuel/Lube Truck Operator 4 95,000 380,000 - -<br />

Shift Labourer 8 67,000 536,000 - -<br />

Subtotal 146 - 14,038,500 0.46 1.25<br />

Mine Maintenance<br />

Heavy Duty Mechanic 16 106,200 1,699,200 - -<br />

Welder 8 106,200 849,600 - -<br />

Wash Bay 4 86,000 344,000 - -<br />

Light Duty Mechanic 8 83,600 668,800 - -<br />

Electrician 8 107,500 860,000 - -<br />

Junior Mechanics 16 98,500 1,576,000 - -<br />

Subtotal 60 - 5,997,600 0.20 0.54<br />

Total Labour 296 - 30,367,800 1.00 2.71<br />

21.3.3 PROCESS OPERATING COSTS<br />

The operating costs were determined by estimating the quantities of consumables,<br />

manpower, and electrical power required on a “per tonne milled” basis.<br />

Consumables considered were reagents, supplies (e.g. mechanical, safety, and<br />

laboratory), and electrical power required for mineralized material processing.<br />

Pricing for reagents and supplies were taken from historical project pricing and<br />

InfoMine Estimating guides. InfoMine Cost Indices for <strong>com</strong>modities were used to<br />

adjust historical pricing to 2012 dollars. The power costs were taken as per<br />

calculations from the Infrastructure team based on natural gas generator power.<br />

The reagent dosages, bond abrasion, and bond work indices were based on the<br />

current metallurgical test work at Lakefield. The bond abrasion test work by<br />

Lakefield, calculated wear rates for liners and grinding media which were used to<br />

determine the cost of those supplies. The SAG and ball grinding mills were sized<br />

and the power consumption determined by bond formulae calculations using the<br />

Prophecy Platinum Corp. 21-15 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!