Table 7 Truck and Shovel Requirements by Year<br />

Year<br />

Mechanical<br />

Availability<br />

(%)<br />

Use of<br />

Availability<br />

(%)<br />

Equipment<br />

Trucks Shovels<br />

Productivity<br />

(wmt/h)<br />

Number<br />

Required<br />

Mechanical<br />

Availability<br />

(%)<br />

Use of<br />

Availability<br />

(%)<br />

Productivity<br />

(wmt/h)<br />

1 85 76.8 351 25 85 76.8 3,067 4<br />

2 85 76.8 317 28 85 76.8 3,096 4<br />

3 85 76.8 313 28 85 76.8 3,099 4<br />

4 85 76.8 312 27 85 76.8 3,100 4<br />

5 85 76.8 314 31 85 76.8 3,086 4<br />

6 85 76.8 296 31 85 76.8 3,093 4<br />

7 85 76.8 290 31 85 76.8 3,093 4<br />

8 85 76.8 299 28 85 76.8 3,101 4<br />

9 85 76.8 328 25 85 76.8 3,103 3<br />

10 85 76.8 335 26 85 76.8 3,098 4<br />

11 85 76.8 336 27 85 76.8 3,094 4<br />

12 85 76.8 335 26 85 76.8 3,099 4<br />

13 85 76.8 334 25 85 76.8 3,102 4<br />

14 85 76.8 336 27 85 76.8 3,092 4<br />

15 85 76.8 289 28 85 76.8 3,108 3<br />

16 85 76.8 289 29 85 76.8 3,103 3<br />

17 85 76.8 289 29 85 76.8 3,102 3<br />

18 85 76.8 289 30 85 76.8 3,096 4<br />

19 85 76.8 289 28 85 76.8 3,107 3<br />

20 85 76.8 277 31 85 76.8 3,102 4<br />

21 85 76.8 277 29 85 76.8 2,431 4<br />

Number<br />

Required<br />

table continues…<br />

Prophecy Platinum Corp, 9 1193460500-REP-R0001-00<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>, Yukon, Canada