01.06.2013 Views

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 10.4 Prophecy Platinum 2011 Drill Results<br />

Borehole<br />

ID<br />

From<br />

(m)<br />

To<br />

(m)<br />

Length<br />

(m)<br />

Prophecy Platinum Corp. 10-5 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada<br />

Ni<br />

(%)<br />

Cu<br />

(%)<br />

Pt<br />

(g/t)<br />

Pd<br />

(g/t)<br />

Au<br />

(g/t)<br />

WS11-184 8.20 478.80 470.60 0.29 0.13 0.20 0.23 0.03<br />

includes 429.30 478.80 49.50 0.71 0.45 0.65 0.52 0.10<br />

WS11-185 8.99 57.88 48.89 0.21 0.02 0.06 0.10 0.01<br />

WS11-188 7.53 464.91 457.38 0.29 0.18 0.34 0.33 0.05<br />

includes 268.38 389.29 120.91 0.36 0.30 0.63 0.54 0.08<br />

WS11-190 4.27 364.57 360.30 0.24 0.09 0.16 0.21 0.03<br />

WS11-191 7.07 89.92 82.85 0.21 0.02 0.08 0.14 0.02<br />

WS11-192 9.45 394.35 384.90 0.30 0.15 0.28 0.30 0.04<br />

includes 272.19 291.42 19.23 0.41 0.28 0.74 0.56 0.06<br />

10.4 S AMPLING M ETHODS<br />

10.4.1 HISTORICAL METHODS<br />

Sampling details for historic programs have not been verified by Tetra Tech. No<br />

documented quality assurance/quality control (QA/QC) programs were available for<br />

review. Hudson Yukon Mining assayed all core at their internal lab in Flin Flon,<br />

Manitoba.<br />

Tetra Tech re<strong>com</strong>mends that Northern Platinum continue to research the details of<br />

the historical programs by Hudson Yukon Mining and the Kluane JV.<br />

10.4.2 CORONATION METHOD AND APPROACH<br />

The drill core was logged by the <strong>com</strong>pany geologist and assistants under the direct<br />

supervision of Mr. Rory Calhoun, P.Geo., at the designated facilities of the<br />

Coronation Minerals base camp on site. The geologist would record lithology,<br />

mineralization, structures, sample number, etc., and the assistants would record the<br />

geotechnical data (rock quality designation (RQD) and recovery).<br />

Sample length would vary due to lithology and mineralization observed by the<br />

geologist and the core would be marked accordingly. Most sampled intervals were<br />

1.52 m or 5 ft in length. The assistant would then take the core into the saw shack<br />

and cut it in half using a core saw. After cutting, the core would be returned to the<br />

core tray and the geologist would sample it. Half of the split core would be placed in<br />

a plastic sample bag with the sample tag. The sample number was also written on<br />

the outside of each bag for easy identification. No sample tags were left in the core<br />

trays.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!