Test: F30 <strong>Project</strong>: 11603-005 50149-001 Date: 09-Feb-12 Operator: YW<br />

Purpose: Split flowsheet<br />

Procedure: As below.<br />

Feed: 2 kg of -10 mesh Master Composite<br />

Grind: 57 minutes/2 kg at 65% solids in a lab mill<br />

Regrind 4 minutes in the pebble mill (Ni clnr 1 concentrate)<br />

Regrind Feed K80 :90 µm<br />

Cu regrind K80: 74 µm<br />

Conditions: Ni regrind K80: 30 µm<br />

Reagents added, grams per tonne Time, minutes<br />

Stage Lime SIPX 4037 CMC Calgon MIBC* Grind Cond. Froth pH Eh<br />

Grind 57<br />

Bulk Rougher 1 10 40 10 1 2 8.8 124.4<br />

Bulk Rougher 2 5 40 5 1 2 8.7 66.7<br />

Ni Scav 1 30 40 6 8.7 53.4<br />

Ni Scav 2 30 40 6 8.7 47.8<br />

Combine Ro Conc 1-2<br />

Bulk 1st Cleaner 0+0+2 10+10+0 0+2+0 3+2+1 8.6 92.2<br />

Regrind (PM) 0<br />

Bulk 2nd Cleaner 5 2+2 8.4 109.6<br />

Bulk 3rd Cleaner 2<br />

Combine Scav Conc 1-2<br />

Ni 1st Cleaner 10+10 30+0 2+2 8.7 79.5<br />

Regrind (PM) 4<br />

Ni 2nd Cleaner 5+5 5+0 2 8.5 59.0<br />

Ni 3rd Cleaner 10 2 7.5 165.8<br />

Total 0 75 0 165 10 15 61 2<br />

*As needed<br />

22<br />

Stage Rougher 1st cleaners 2nd & 3rd clnr & sep<br />

Flotation Cell 1000 g D-12 500 g D-12 250 g D-12<br />

Speed: r.p.m.<br />

Metallurgical Balance<br />

1800 1600 1200 PSA On Ni Regrind<br />

Assay for Cu, Ni, S<br />

Product<br />

Weight Assays, % % Distribution<br />

g % Cu Ni S Cu Ni S<br />

Bulk 3rd Clnr Conc. 31.7 1.62 14.2 4.79 22.4 75.3 19.7 14.9<br />

Bulk 3rd Clnr Tail 1.6 0.08 1.12 4.24 21.1 0.3 0.9 0.7<br />

Bulk 2nd Clnr Tail 28.7 1.47 0.95 5.83 9.51 4.6 21.7 5.7<br />

Bulk 1st Clnr Tail 48.6 2.48 0.17 1.41 3.93 1.4 8.9 4.0<br />

Ni 3rd Clnr Conc 8.6 0.44 2.64 6.08 13.2 3.8 6.8 2.4<br />

Ni 3rd Clnr Tail 2.8 0.14 2.68 6.18 26.4 1.3 2.2 1.6<br />

Ni 2nd Clnr Tail 24.3 1.24 0.34 1.97 14.4 1.4 6.2 7.4<br />

Ni 1st Clnr Tail 114.8 5.86 0.18 0.47 7.40 3.5 7.0 17.9<br />

Ni Scav Tail 1697 86.7 0.03 0.12 1.27 8.5 26.5 45.4<br />

Head (calc.) 1959 100.0 0.31 0.39 2.43 100.0 100.0 100.0<br />

(direct)<br />

Combined Products<br />

0.33 0.42 2.53<br />

Bulk 3rd Clnr Conc 31.7 1.62 14.2 4.79 22.4 75.3 19.7 14.9<br />

Bulk 2nd Clnr Conc 33.3 1.70 13.6 4.76 22.3 75.6 20.6 15.7<br />

Bulk 1st Clnr Conc 62.0 3.17 7.73 5.26 16.4 80.2 42.4 21.4<br />

Bulk Rougher Conc 111 5.65 4.41 3.57 10.9 81.6 51.3 25.4<br />

Ni 3rd Clnr Conc 8.6 0.44 2.64 6.08 13.2 3.8 6.8 2.4<br />

Ni 2nd Clnr Conc 11.4 0.58 2.65 6.10 16.4 5.1 9.0 3.9<br />

Ni 1st Clnr Conc 35.7 1.82 1.08 3.29 15.1 6.4 15.3 11.3<br />

Ni Scav Conc 151 7.68 0.39 1.14 9.22 9.9 22.3 29.2<br />

Bulk Rghr+Scav Conc 261 13.3 2.09 2.17 9.94 91.5 73.5 54.62<br />

Metallurgical Balance<br />

Product<br />

Weight Assays, %<br />

% Distribution<br />

g % Cu Ni S other Cp Pn Po Ga Cu Ni S Cp Pn Po Ga<br />

Bulk 3rd Clnr Conc. 31.7 1.62 14.2 4.79 22.4 58.6 41.0 13.9 8.95 36.1 75.3 19.7 14.9 75.3 24.0 3.1 0.6<br />

Bulk 3rd Clnr Tail 1.6 0.08 1.12 4.24 21.1 73.5 3.24 11.7 41.8 43.3 0.3 0.9 0.7 0.3 1.0 0.7 0.04<br />

Bulk 2nd Clnr Tail 28.7 1.47 0.95 5.83 9.51 83.7 2.75 16.9 7.70 72.7 4.6 21.7 5.7 4.6 26.5 2.4 1.1<br />

Bulk 1st Clnr Tail 48.6 2.48 0.17 1.41 3.93 94.5 0.49 3.90 6.40 89.2 1.4 8.9 4.0 1.4 10.4 3.4 2.4<br />

Ni 3rd Clnr Conc 8.6 0.44 2.64 6.08 13.2 78.1 7.63 17.6 12.3 62.5 3.8 6.8 2.4 3.8 8.2 1.1 0.3<br />

Ni 3rd Clnr Tail 2.8 0.14 2.68 6.18 26.4 64.7 7.75 17.3 46.6 28.4 1.3 2.2 1.6 1.3 2.6 1.4 0.0<br />

Ni 2nd Clnr Tail 24.3 1.24 0.34 1.97 14.4 83.3 0.98 5.14 32.0 61.9 1.4 6.2 7.4 1.4 6.8 8.5 0.8<br />

Ni 1st Clnr Tail 114.8 5.86 0.18 0.47 7.40 92.0 0.52 0.95 17.9 80.6 3.5 7.0 17.9 3.5 5.9 22.4 5.1<br />

Ni Scav Tail 1697 86.7 0.03 0.12 1.27 98.6 0.09 0.16 3.08 96.7 8.5 26.5 45.4 8.5 14.5 56.9 89.6<br />

Head (calc.) 1959 100.0 0.31 0.39 2.43 96.9 0.88 0.94 4.68 93.5 100.0 100.0 100.0 100.0 100.0 100.0 100.0<br />

(direct)<br />

Combined Products<br />

0.33 0.42 2.53<br />

Bulk 3rd Clnr Conc 31.7 1.62 14.2 4.79 22.4 58.6 41.0 13.9 8.95 36.1 75.3 19.7 14.9 75.3 24.0 3.1 0.6<br />

Bulk 2nd Clnr Conc 33.3 1.70 13.6 4.76 22.3 59.3 39.2 13.8 10.5 36.5 75.6 20.6 15.7 75.6 25.0 3.8 0.7<br />

Bulk 1st Clnr Conc 62.0 3.17 7.73 5.26 16.4 70.6 22.3 15.2 9.22 53.2 80.2 42.4 21.4 80.2 51.5 6.2 1.8<br />

Bulk Rougher Conc 111 5.65 4.41 3.57 10.9 81.1 12.7 10.2 7.98 69.0 81.6 51.3 25.4 81.6 61.9 9.6 4.2<br />

Ni 3rd Clnr Conc 8.6 0.44 2.64 6.08 13.2 78.1 7.63 17.6 12.3 62.5 3.8 6.8 2.4 3.8 8.2 1.1 0.3<br />

Ni 3rd Clnr Conc 11.4 0.58 2.65 6.10 16.4 74.8 7.66 17.5 20.7 54.1 5.1 9.0 3.9 5.1 10.9 2.6 0.3<br />

Ni 1st Clnr Conc 35.7 1.82 1.08 3.29 15.1 80.6 3.11 9.09 28.4 59.4 6.4 15.3 11.3 6.4 17.7 11.1 1.2<br />

Ni Scav Conc 151 7.68 0.39 1.14 9.22 89.3 1.14 2.88 20.4 75.6 9.9 22.3 29.2 9.9 23.6 33.4 6.2<br />

Bulk Rghr+Scav Conc 261 13.3 2.09 2.17 9.94 85.8 6.05 6.00 15.1 72.8 91.5 73.5 54.6 91.5 85.5 43.1 10.4