26.5 E NVIRONMENTAL<br />

The <strong>Project</strong> will be subject to an EA under YESAA, prior to submitting a YESAA<br />

<strong>Project</strong> Proposal Form (quartz exploration) to a DO, proponents are strongly<br />

encouraged to contact all regulators responsible for regulating the proposed project<br />

activities and attach copies of all <strong>com</strong>pleted regulatory applications, forms or notices<br />

to their submission. Doing so will provide the YESAB with the information required to<br />

conduct an assessment and may reduce assessment timelines.<br />

In addition, this assessment will need to be supported by site-specific environmental<br />

baseline data. The period of study needs to be of sufficient duration to fully describe<br />

the potential affect on the environment and to understand the potential effects of the<br />

project. A minimum period of 12 to 24 contiguous months of study will be required to<br />

provide coverage of all four seasons. Studies often continue beyond the minimum<br />

12 mo period, particularly in cases of abnormal seasonal conditions. Most projects<br />

taken into the EA process in Yukon have had two or more years of baseline study.<br />

The Environmental Baseline Studies (EBS) scope is typically developed in<br />

consultation with the local and regional resource management and regulatory<br />

agencies in order to ensure that agency concerns can be addressed with the study<br />

results. The initial EBS report is typically <strong>com</strong>pleted within 24 to 28 mo of the start of<br />

the field program and the Environmental Impact <strong>Assessment</strong> is typically based upon<br />

this initial EBS report.<br />

Baseline studies will need to focus on site specific weather conditions, hydrogeology,<br />

mineralized material/waste rock/soil geochemistry, aquatic resources (hydrology,<br />

water quality), fish and fish habitat; birds, including migratory birds and raptors;<br />

vegetation, including rare plants and ecosystems; wildlife, such as grizzly bear and<br />

Woodland caribou; and areas of archaeological significance.<br />

The total estimated cost for the first phase of the above work is US$200,000. This<br />

estimate does not include specific studies of animals, such as those involving radartracking.<br />

26.5.1 SOCIAL CONSIDERATIONS<br />

Further study requirements and advice on <strong>com</strong>munications include:<br />

• ongoing discussions with local First Nations to establish meaningful<br />

relationships regarding consultation processes and address concerns<br />

• determine local First Nations heritage interests within and around the<br />

development area<br />

• work with designated First Nations representatives on development of<br />

mitigation alternatives to address potential impacts (e.g. environment,<br />

heritage, health) to First Nations <strong>com</strong>munities<br />

• develop a <strong>com</strong>munications strategy for the <strong>com</strong>munity<br />

Prophecy Platinum Corp. 26-7 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />