01.06.2013 Views

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Prophecy Platinum Corporation – <strong>Wellgreen</strong> Property – <strong>Project</strong> 50149-001<br />

the froth. The heavy froth is likely from the Cu which suggests floating the Cu ahead of most of the Ni and<br />

deal with Ni in separate cleaners, a split-stream flowsheet circuit.<br />

Finally test F40 was conducted to repeat test F17. Rougher tailing from this test was directed to a<br />

magnetic separation stage. No improvement in the Ni recovery was observed in this test.<br />

Figure 21: Cleaner Flotation Tests Flowsheet<br />

Figure 22 shows the copper grade-recovery relationships for the cleaner tests and Figure 23 <strong>com</strong>pares<br />

the recovery of each of the pay-metals; Cu and Ni as well as Pt, Pd, and Au as a function of <strong>com</strong>bined<br />

Cu+Ni and PGE grades, respectively.<br />

SGS Minerals Services<br />

34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!