26.2 M INING<br />

sample selection should be distributed from across the entire mineralized system and<br />

from various grade groups. If platinum and palladium assays do not exist for the<br />

selected samples, platinum and palladium analyses should be <strong>com</strong>pleted as well.<br />

Tetra Tech also re<strong>com</strong>mends that all drilling programs with SG samples should be<br />

collected systematically in the various rock types and grade ranges. This will<br />

generate enough data to develop a robust regression formula for SG values, based<br />

on the grades of the resource blocks.<br />

BLOCK MODEL<br />

The block model used in the optimization is a whole mass although there had been<br />

mining operations in the past. Reports from production records indicate that Hudson<br />

Yukon Mining produced 171,652 tons (155,720 t) assaying 2.23% nickel, 1.39%<br />

copper, 0.065 oz/ton platinum and 0.073% cobalt between 1972 and 1973. This<br />

likely does not include the drifting, which is both in and out of the mineralized<br />

material. Since the tonnage was so small relative to the resource (less than 0.05%<br />

of the total resource), it was not considered to be material to the overall resource.<br />

For the advanced levels of study, prefeasibility and feasibility, this needs to be<br />

addressed.<br />

PIT O PTIMIZATION<br />

The pit optimization should be updated with the recent results of the metallurgical<br />

test work and the costs derived from the economic analysis.<br />

The economic cut-off grade determined in the current pit optimization should be<br />

validated with metallurgical test results of samples within this low grade range.<br />

OVERALL P IT SLOPE ANGLE<br />

A <strong>com</strong>prehensive geomechanical study is required for the next level of study, since<br />

the pit slope angles were based on conservative estimates from previous experience.<br />

A steepening of pit walls may improve the mine plan and economic evaluation.<br />

Details on wall slope stability by orientation and by rock type is required.<br />

HYDROGEOLOGY<br />

A <strong>com</strong>prehensive hydrological study is required for the next level of study. Pit<br />

dewatering parameters need to be determined and the extent of the requirement for<br />

dewatering wells needs to be assessed if dewatering is required. A detailed<br />

Prophecy Platinum Corp. 26-4 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!