Test: F36 <strong>Project</strong>: 11603-005 50149-001 Date: Feb 23 2012 Operator: YW<br />

Purpose: Split flowsheet, CMC and Guar 50:50 mix similar to F-35, but more aggressive for recovery<br />

Procedure: As below.<br />

Feed: 2x2 kg of -10 mesh Master Composite<br />

Grind:<br />

Regrind<br />

57 minutes/2 kg at 65% solids in a lab mill<br />

Regrind 8 minutes in the pebble mill (Ni clnr 1 concentrate) Feed K80 : 90 µm<br />

Ni regrind K80: µm<br />

Conditions:<br />

Reagents added, grams per tonne Time, minutes<br />

Stage Lime SIPX CuSO4 CMC Guar MIBC* Grind Cond. Froth pH Eh<br />

Grind 57<br />

Bulk Rougher 1 15 30 30 12 1 3 8.3 110.7<br />

Bulk Rougher 2 20 20 20 1 3 8.4 55.2<br />

Ni Scav 1 30 200 6 8.2 137.2<br />

Ni Scav 2 30 6<br />

Ni Scav 3 30 6 8.2 16.4<br />

Combine Ro Conc 1-2<br />

Bulk 1st Cleaner A 10 10 2 8.4 70.9<br />

B 10 2<br />

Bulk 2nd Cleaner A 0 5 5 2 8.2 101.1<br />

B 5 2<br />

Combine Scav Conc 1-3<br />

Ni 1st Cleaner 20 15 15 3 8.3 81.3<br />

10 3<br />

Regrind (PM) 8<br />

Ni 2nd Cleaner 20 50 5 5 4 8.4 67.5<br />

Ni 3rd Cleaner 10 2.5 2.5 3 7.8 44.2<br />

Total 0 200 250 87.5 87.5 12 65 2<br />

*As needed<br />

45<br />

Stage Rougher 2nd clnr<br />

3rd clnr<br />

Flotation Cell 2000 g D-12 500 g D-12 250 g D-12<br />

Speed: r.p.m. 1500 1600<br />

1200<br />

Metallurgical Balance<br />

Product<br />

Weight Assays, (Pt, Pd, Au g/t), (Cu, Ni, S, Fe, MgO %) % Distribution<br />

g % Cu Ni Pt Pd Au S Fe MgO Cu Ni Pt Pd Au S Fe MgO<br />

Bulk 2nd Clnr Conc. 126.5 3.22 8.85 8.94 2.22 6.79 0.72 26.6 32.1 4.77 80.1 59.3 20.9 55.3 29.6 28.7 8.4 0.7<br />

Bulk 2nd Clnr Tail 46.1 1.17 0.38 1.67 1.50 1.52 0.18 6.55 14.0 21.4 1.3 4.0 5.2 4.5 2.74 2.6 1.3 1.2<br />

Bulk 1st Clnr Tail 126 3.21 0.18 0.59 0.87 0.67 0.06 3.81 11.6 22.8 1.6 3.9 8.2 5.5 2.46 4.1 3.0 3.4<br />

Ni 3rd Clnr Conc 111.1 2.83 0.41 1.32 1.30 0.78 0.17 30.8 47.3 5.23 3.3 7.7 10.8 5.6 6.06 29.2 10.8 0.7<br />

Ni 3rd Clnr Tail 52.7 1.34 0.32 0.75 1.42 0.75 0.14 16.0 29.9 14.9 1.2 2.1 5.6 2.6 2.40 7.2 3.2 0.9<br />

Ni 2nd Clnr Tail 85.1 2.17 0.28 0.50 0.94 0.39 0.08 12.3 26.4 16.3 1.7 2.2 6.0 2.1 2.21 8.9 4.6 1.6<br />

Ni 1st Clnr Tail 150 3.82 0.15 0.27 0.65 0.43 0.09 2.48 11.9 22.7 1.6 2.1 7.3 4.1 4.14 3.2 3.7 4.0<br />

Ni Scav Tail 3232 82.2 0.04 0.11 0.15 0.10 0.05 0.59 9.75 23.2 9.2 18.6 36.1 20.4 50.4 16.2 64.9 87.6<br />

Head (calc.) 3929 100.0 0.36 0.49 0.34 0.40 0.08 2.99 12.4 21.8 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0<br />

(direct)<br />

Combined Products<br />

0.33 0.42 0.41 0.45 0.04 2.53 11.9 22.8<br />

Bulk 2nd Clnr Conc 126.5 3.22 8.85 8.94 2.2 6.79 0.72 26.6 32.1 4.8 80.1 59.3 20.9 55.3 29.6 28.7 8.4 0.7<br />

Bulk 1st Clnr Conc 172.6 4.39 6.59 7.00 2.0 5.38 0.58 21.2 27.3 9.2 81.3 63.3 26.1 59.8 32.3 31.2 9.7 1.9<br />

Bulk Rougher Conc 298.6 7.60 3.88 4.29 1.54 3.40 0.36 13.9 20.7 14.9 83.0 67.2 34.3 65.2 34.8 35.3 12.7 5.2<br />

Ni 3rd Clnr Conc 111.1 2.83 0.41 1.32 1.3 0.78 0.17 30.8 47.3 5.2 3.3 7.7 10.8 5.58 6.06 29.2 10.8 0.7<br />

Ni 2nd Clnr Conc 163.8 4.17 0.38 1.14 1.3 0.77 0.16 26.0 41.7 8.3 4.5 9.8 16.3 8.13 8.46 36.3 14.1 1.6<br />

Ni 1st Clnr Conc 248.9 6.33 0.35 0.92 1.2 0.64 0.13 21.3 36.5 11.1 6.2 12.0 22.3 10.3 10.7 45.3 18.7 3.2<br />

Ni Scav Conc 398.9 10.2 0.27 0.67 0.99 0.56 0.11 14.2 27.2 15.4 7.8 14.1 29.6 14.4 14.8 48.4 22.4 7.2<br />

Bulk Rghr+Scav Conc 697.5 17.8 1.82 2.22 1.23 1.77 0.22 14.1 24.4 15.2 90.8 81.4 63.9 79.6 49.6 83.8 35.1 12.4<br />

Metallurgical Balance<br />

Product<br />

Weight Assays, % % Distribution<br />

g % Cu Ni S other Cp Pn Po Ga Cu Ni S Cp Pn Po Ga<br />

Bulk 2nd Clnr Conc. 126.5 3.22 8.85 8.94 26.6 55.6 25.6 25.8 23.6 25.0 80.1 59.3 28.7 80.1 69.9 13.1 0.87<br />

Bulk 2nd Clnr Tail 46.1 1.17 0.38 1.67 6.55 91.4 1.10 4.58 12.1 82.3 1.3 4.0 2.6 1.3 4.5 2.4 1.05<br />

Bulk 1st Clnr Tail 126 3.21 0.18 0.59 3.81 95.4 0.52 1.46 8.15 89.9 1.6 3.9 4.1 1.6 3.9 4.5 3.1<br />

Ni 3rd Clnr Conc 111.1 2.83 0.41 1.32 30.8 67.5 1.18 2.50 76.6 19.7 3.3 7.7 29.2 3.3 5.9 37.4 0.6<br />

Ni 3rd Clnr Tail 52.7 1.34 0.32 0.75 16.0 82.9 0.92 1.43 39.4 58.3 1.2 2.1 7.2 1.2 1.6 9.1 0.8<br />

Ni 2nd Clnr Tail 85.1 2.17 0.28 0.50 12.3 86.9 0.81 0.83 30.4 67.9 1.7 2.2 8.9 1.7 1.5 11.4 1.6<br />

Ni 1st Clnr Tail 150 3.82 0.15 0.27 2.48 97.1 0.43 0.56 5.55 93.5 1.6 2.1 3.2 1.6 1.8 3.7 3.9<br />

Ni Scav Tail 3232 82.2 0.04 0.11 0.59 99.3 0.12 0.16 1.29 98.4 9.2 18.6 16.2 9.2 10.8 18.3 88.0<br />

Head (calc.) 3929 100.0 0.36 0.49 2.99 96.2 1.03 1.19 5.79 92.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0<br />

(direct)<br />

Combined Products<br />

0.33 0.42 2.53<br />

Bulk 2nd Clnr Conc 127 3.22 8.85 8.94 26.6 55.6 25.6 25.8 23.6 25.0 80.1 59.3 28.7 80.1 69.9 13.1 0.9<br />

Bulk 1st Clnr Conc 173 4.39 6.59 7.00 21.2 65.2 19.0 20.2 20.5 40.3 81.3 63.3 31.2 81.3 74.4 15.6 1.9<br />

Bulk Rougher Conc 299 7.60 3.88 4.29 13.9 77.9 11.2 12.3 15.3 61.2 83.0 67.2 35.3 83.0 78.4 20.1 5.1<br />

Ni 3rd Clnr Conc 111 2.83 0.41 1.32 30.8 67.5 1.18 2.50 76.6 19.7 3.3 7.7 29.2 3.3 5.9 37.4 0.6<br />

Ni 2nd Clnr Conc 164 4.17 0.38 1.14 26.0 72.4 1.10 2.16 64.6 32.1 4.5 9.8 36.3 4.5 7.6 46.5 1.5<br />

Ni 1st Clnr Conc 249 6.33 0.35 0.92 21.3 77.4 1.00 1.70 52.9 44.4 6.2 12.0 45.3 6.2 9.1 57.9 3.1<br />

Ni Scav Conc 399 10.2 0.27 0.67 14.2 84.8 0.79 1.27 35.1 62.8 7.8 14.1 48.4 7.8 10.9 61.6 6.9<br />

Bulk Rghr+Scav Conc 698 17.8 1.82 2.22 14.1 81.9 5.26 5.98 26.6 62.1 90.8 81.4 83.8 90.8 89.2 81.7 12.0