22.2 P RINCIPAL A SSUMPTIONS<br />

For the purpose of this <strong>Project</strong>’s financial analysis, Tetra Tech applied the following<br />

study results and assumptions:<br />

• All costs, revenues, and financial evaluation are calculated and presented in<br />

US dollars.<br />

• The <strong>Project</strong> LOM will be 37 years.<br />

• A detailed mine production schedule was included in the financial model.<br />

• An average of 24,000 t of nickel will be produced annually.<br />

• The processing recoveries used were 67.60% nickel, 87.80% copper,<br />

64.40% cobalt, 58.90% gold, 46.00% platinum, and 72.90% palladium.<br />

• The <strong>Project</strong>’s average annual throughput will be 39,000,000 t <strong>com</strong>bined<br />

waste and mineralized material.<br />

• The initial capital cost for the <strong>Project</strong> is estimated at US$863 million.<br />

• The mine sustaining capital cost for the project is estimated at<br />

US$1,122 million.<br />

• The TMF sustaining capital estimates are included in the financial model.<br />

• The end-of-project salvage value was not included.<br />

• The average operating cost was estimated to be US$29.74/t milled.<br />

• The smelting recoveries used were 90.00% nickel, 98.00% copper, 90.00%<br />

cobalt, 96.00% gold, 96.00% platinum, and 96.00% palladium.<br />

• Smelting, refining and transportation charges were assumed to be 25% of<br />

the gross metal revenues.<br />

• No royalties or product insurance costs were included.<br />

• A discount rate of 8% was applied.<br />

22.3 P RE- T AX M ODEL<br />

The mine production schedule has been incorporated into the 100% equity pre-tax<br />

financial model to develop annual recovered metal production from the relationship<br />

between tonnage milled, head grades and recoveries.<br />

The LOM mineralized material tonnages, grades and metal production are indicated<br />

in Table 22.3.<br />

Prophecy Platinum Corp. 22-2 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!