- Page 1 and 2:
Report to: Wellgreen Project Prelim
- Page 3 and 4:
TABLE OF CONTENTS 1.0 SUMMARY .....
- Page 5 and 6:
14.1.8 MINERAL RESOURCE TABULATION
- Page 7 and 8:
26.1.2 PHASE 2 - QUILL CREEK ULTRAM
- Page 9 and 10:
Table 19.2 Palladium Demand and Sup
- Page 11 and 12:
Figure 19.3 London Metals Exchange
- Page 13 and 14:
litres per minute .................
- Page 15 and 16:
International All-North Resources L
- Page 17 and 18:
1.0 S UMMARY 1.1 I NTRODUCTION Tetr
- Page 19 and 20:
This PEA has been prepared by Tetra
- Page 21 and 22:
Numerous operators have worked on t
- Page 23 and 24:
1.6 M INING M ETHODS The Project is
- Page 25 and 26:
Figure 1.2 Wellgreen Project Overal
- Page 27 and 28:
Table 1.6 Capital Cost Summary (US$
- Page 29 and 30:
The following financial results wer
- Page 31 and 32:
Figure 1.3 illustrates that the Pro
- Page 33 and 34:
Figure 1.5 Project Execution Plan P
- Page 35 and 36:
2.0 INTRODUCTION Tetra Tech was com
- Page 37 and 38:
3.0 RELIANCE ON OTHER EXPERTS Tetra
- Page 39 and 40:
Figure 4.1 Location Map Prophecy Pl
- Page 41 and 42:
All work undertaken on the surface
- Page 43 and 44:
Figure 4.3 Wellgreen Surface Lease
- Page 45 and 46:
Other than those liabilities set fo
- Page 47 and 48:
5.3 C LIMATE The climate is alpine,
- Page 49 and 50:
Year Company Activities 1970 Hudson
- Page 51 and 52:
Year Company Activities 2008 Corona
- Page 53 and 54:
6.2.3 NORTHERN P LATINUM 2009 PROGR
- Page 55 and 56:
Figure 7.1 Regional Geology Map Pro
- Page 57 and 58:
Figure 7.3 Property Geology Prophec
- Page 59 and 60:
Longitudinal faults and/or shears a
- Page 61 and 62:
Figure 7.4 Wellgreen Plan View Prop
- Page 63 and 64:
7.2.3 NORTH ZONE The North Zone is
- Page 65 and 66:
Table 7.3 PGE-Bearing Minerals in t
- Page 67 and 68:
Gabbroid-associated Nickel, Copper,
- Page 69 and 70:
10.0 DRILLING 10.1 H ISTORICAL D RI
- Page 71 and 72:
Figure 10.1 Prophecy Platinum Drill
- Page 73 and 74:
Table 10.4 Prophecy Platinum 2011 D
- Page 75 and 76:
• The course rejects returned fro
- Page 77 and 78:
Figure 10.4 Core Storage Facility P
- Page 79 and 80:
11.0 SAMPLE PREPARATION, ANALYSES,
- Page 81 and 82:
12.0 DATA VERIFICATION Tetra Tech
- Page 83 and 84:
Table 12.2 Check Assays Prophecy Pl
- Page 85 and 86:
13.0 MINERAL PROCESSING AND METALLU
- Page 87 and 88:
An elemental analysis of typical co
- Page 89 and 90:
Minerals Peridotite Composite 1 Min
- Page 91 and 92:
Ni Deposits” shows that the grade
- Page 93 and 94:
13.3 SGS V ANCOUVER - J UNE 2012 A
- Page 95 and 96:
14.0 MINERAL RESOURCE ESTIMATES 14.
- Page 97 and 98:
Table 14.3 summarizes the grade cap
- Page 99 and 100:
The NiEq value was assigned to all
- Page 101 and 102:
Table 14.7 Wellgreen Variogram Summ
- Page 103 and 104:
Table 14.9 Estimation Criteria Zone
- Page 105 and 106:
Table 14.10 Search Parameters Zone
- Page 107 and 108:
NiEq Cut-off Tonnes NiEq (%) Ni (%)
- Page 109 and 110:
Figure 14.2 Wellgreen Platinum, Pal
- Page 111 and 112:
Figure 14.4 Wellgreen Platinum, Pal
- Page 113 and 114:
Figure 14.6 Wellgreen Pit Resource
- Page 115 and 116:
14.1.9 VALIDATION The Wellgreen mod
- Page 117 and 118:
Figure 14.9 East Zone Cross Section
- Page 119 and 120:
Figure 14.10 Wellgreen Nickel Secti
- Page 121 and 122:
Figure 14.14 Wellgreen Platinum Sec
- Page 123 and 124:
Figure 14.18 Wellgreen Cobalt Eleva
- Page 125 and 126:
14.2 P REVIOUS E STIMATES Table 14.
- Page 127 and 128:
15.0 MINERAL RESERVE ESTIMATES A mi
- Page 129 and 130:
The selected base case pit contains
- Page 131 and 132:
OVERALL O PEN P IT SLOPE ANGLE Tetr
- Page 133 and 134:
Table 16.4 Pit Optimization Results
- Page 135 and 136:
The pit optimization process includ
- Page 137 and 138:
16.4 P RODUCTION S CHDULE Using Pit
- Page 139 and 140:
Year Waste (t) Total (t) Strip Rati
- Page 141 and 142:
Figure 16.5 Sequence of Development
- Page 143 and 144:
PHASE III During Phase III, the pit
- Page 145 and 146:
16.5.4 EXPLOSIVES A contractor will
- Page 147 and 148:
Table 16.9 Pit Design Criteria Item
- Page 149 and 150:
Equipment Fleet Size Units Crew Bus
- Page 151 and 152:
Figure 17.1 Overall Wellgreen Proce
- Page 153 and 154:
17.2 P ROCESS D ESIGN C RITERIA The
- Page 155 and 156:
17.5 P ROCESS P LANT The process pl
- Page 157 and 158:
Figure 18.1 Wellgreen Project Overa
- Page 159 and 160:
ultimate impoundment surface area o
- Page 161 and 162:
Table 19.2 Palladium Demand and Sup
- Page 163 and 164:
Figure 19.3 London Metals Exchange
- Page 165 and 166:
Figure 19.5 Nickel Demand (2009 to
- Page 167 and 168:
20.0 ENVIRONMENTAL STUDIES, PERMITT
- Page 169 and 170:
Tailings and mill concentrate sampl
- Page 171 and 172:
20.2.4 AQUATIC RESOURCES The Proper
- Page 173 and 174:
Figure 20.2 Wildlife Ranges-Woodlan
- Page 175 and 176:
Figure 20.4 Wildlife Ranges-Mountai
- Page 177 and 178:
Figure 20.6 Wildlife Ranges-Grizzly
- Page 179 and 180:
Figure 20.8 Aquatic Resources Proph
- Page 181 and 182:
20.3.2 LICENSING The Project will b
- Page 183 and 184:
(Transport Canada 2010). New constr
- Page 185 and 186:
Table 20.1 Applicable Legislation,
- Page 187 and 188:
20.4 M I NE C LOSURE AND R ECLAMATI
- Page 189 and 190:
Umbrella Final Agreement, the White
- Page 191 and 192:
20.5.2 NON-ABORIGINAL COMMUNITIES T
- Page 193 and 194:
21.0 C APITAL AND O PERATING C OSTS
- Page 195 and 196:
Mine Equipment 21.2.2 SUSTAINING 20
- Page 197 and 198:
Table 21.7 Contingency (US$ million
- Page 199 and 200: • mobilization and demobilization
- Page 201 and 202: Spares • safety including safety
- Page 203 and 204: 21.3 O PERATING C OSTS 21.3.1 GENER
- Page 205 and 206: Table 21.11 Summary of Mining Opera
- Page 207 and 208: Mine Operations Position No. Annual
- Page 209 and 210: 22.0 ECONOMIC A NALYSIS 22.1 I NTRO
- Page 211 and 212: Table 22.3 Metal Production from th
- Page 213 and 214: Table 22.4 Summary of Pre-tax Finan
- Page 215 and 216: 22.4 M ETAL P RICE S CENARIOS The L
- Page 217 and 218: Figure 22.3 IRR Sensitivity Analysi
- Page 219 and 220: Figure 23.1 Adjacent Properties Pro
- Page 221 and 222: Figure 24.1 Wellgreen Project Execu
- Page 223 and 224: 25.2 M INING Table 25.1 Wellgreen R
- Page 225 and 226: Table 25.4 Process Capital Cost Sum
- Page 227 and 228: Table 26.1 Wellgreen Expansion Budg
- Page 229 and 230: 26.2 M INING sample selection shoul
- Page 231 and 232: Trade-off studies should be complet
- Page 233 and 234: • develop a negotiation strategy
- Page 235 and 236: METALLURGY Davis, David and Bruwer,
- Page 237 and 238: Yukon Environmental and Socio-econo
- Page 239 and 240: TODD MCCRACKEN, P.GEO. I, Todd McCr
- Page 241 and 242: PHILIP BRIDSON, P.ENG. I, Philip Br
- Page 243 and 244: APPENDIX A L IST OF C LAIMS
- Page 245 and 246: District GrantNumber RegType ClaimN
- Page 247 and 248: District GrantNumber RegType ClaimN
- Page 249: District GrantNumber RegType ClaimN
- Page 257 and 258: Element Table 2 - WMS-1a Provisiona
- Page 259 and 260: INTENDED USE WMS-1a is suitable for
- Page 261 and 262: Certificate of Analysis First issue
- Page 263 and 264: Constituent Unit Mean Table 2 - Pro
- Page 265 and 266: performed by GSC on 10g-samples usi
- Page 267 and 268: APPENDIX C SGS R EPORT
- Page 269 and 270: Prophecy Platinum Corporation - Wel
- Page 271 and 272: Prophecy Platinum Corporation - Wel
- Page 273 and 274: Prophecy Platinum Corporation - Wel
- Page 275 and 276: Prophecy Platinum Corporation - Wel
- Page 277 and 278: Prophecy Platinum Corporation - Wel
- Page 279 and 280: Chemical Assay (%) 100 10 1 Prophec
- Page 281 and 282: Cumulative % Mineral Mass Prophecy
- Page 283 and 284: Mass (% Chalcopyrite) Prophecy Plat
- Page 285 and 286: Mass (% Pentlandite) Prophecy Plati
- Page 287 and 288: Mass (% Pyrrhotite) Prophecy Platin
- Page 289 and 290: Ni Recovery % Prophecy Platinum Cor
- Page 291 and 292: % Liberated in fraction Prophecy Pl
- Page 293 and 294: Prophecy Platinum Corporation - Wel
- Page 295 and 296: Prophecy Platinum Corporation - Wel
- Page 297 and 298: Recovery, % Recovery, % 100 80 60 4
- Page 299 and 300: Cu Rec, % Pt Rec, % 100 95 90 85 80
- Page 301 and 302:
Recovery, % Recovery, % 100 80 60 4
- Page 303 and 304:
Prophecy Platinum Corporation - Wel
- Page 305 and 306:
Prophecy Platinum Corporation - Wel
- Page 307 and 308:
Prophecy Platinum Corporation - Wel
- Page 309 and 310:
. Cu Recovery (%) 100 95 90 85 80 7
- Page 311 and 312:
Prophecy Platinum Corporation - Wel
- Page 313 and 314:
Prophecy Platinum Corporation - Wel
- Page 315 and 316:
Re-grinding Prophecy Platinum Corpo
- Page 317 and 318:
Prophecy Platinum Corporation - Wel
- Page 319 and 320:
Prophecy Platinum Corporation - Wel
- Page 321 and 322:
Prophecy Platinum Corporation - Wel
- Page 323 and 324:
Prophecy Platinum Corporation - Wel
- Page 325 and 326:
Prophecy Platinum Corporation - Wel
- Page 327 and 328:
Prophecy Platinum Corporation - Wel
- Page 329 and 330:
Prophecy Platinum Corporation - Wel
- Page 331 and 332:
Prophecy Platinum Corporation - Wel
- Page 333 and 334:
Prophecy Platinum Corporation - Wel
- Page 335 and 336:
Prophecy Platinum Corporation - Wel
- Page 337 and 338:
Prophecy Platinum Corporation - Wel
- Page 339 and 340:
An Investigation into METALLURGICAL
- Page 341 and 342:
50149-001 Prophecy First shipment P
- Page 343 and 344:
Prophecy Platinum Corporation - Wel
- Page 345 and 346:
OnLine LIMS Tag Sn g/t Sr g/t Ti g/
- Page 347 and 348:
OnLine LIMS SGS Lakefield Research
- Page 349 and 350:
Final : VC120756 Revision REVISED O
- Page 351 and 352:
Final : VC120756 Revision REVISED O
- Page 353 and 354:
Certificate of Analysis Work Order:
- Page 355 and 356:
Certificate of Analysis Work Order:
- Page 357 and 358:
Final : VC120590 Revision REVISED O
- Page 359 and 360:
Final : VC120590 Revision REVISED O
- Page 361 and 362:
OnLine LIMS SGS Lakefield Research
- Page 363 and 364:
Prophecy Platinum Corporation - Wel
- Page 365 and 366:
Grindability Test Data Project No.:
- Page 367 and 368:
SGS Minerals Services STANDARD BOND
- Page 369 and 370:
Prophecy Platinum Corporation - Wel
- Page 371 and 372:
SGS Minerals Services Project No. D
- Page 373 and 374:
K 80 (microns) 400 350 300 250 200
- Page 375 and 376:
Prophecy Platinum Corporation - Wel
- Page 377 and 378:
Test No.: F2 Project No.: 50149-001
- Page 379 and 380:
Test No.: F4 Project No.: 50149-001
- Page 381 and 382:
Test No.: F6 Project No.: 50149-001
- Page 383 and 384:
Test No.: F8 Project No.: 50149-001
- Page 385 and 386:
Test No.: F10 Project No.: 50149-00
- Page 387 and 388:
Test No.: F12 Project No.: 50149-00
- Page 389 and 390:
Test No.: F14 Project No.: 50149-00
- Page 391 and 392:
Test No.: F16 Project No.: 50149-00
- Page 393 and 394:
Test No.: F18 Project No.: 50149-00
- Page 395 and 396:
Test No.: F19 Project No.: 50149-00
- Page 397 and 398:
Test No.: F21 Project No.: 50149-00
- Page 399 and 400:
Test No.: F23 Project No.: 50149-00
- Page 401 and 402:
Test No.: F25 Project No.: 50149-00
- Page 403 and 404:
Test No.: F27 Project No.: 50149-00
- Page 405 and 406:
Test: F29 Project: 11603-005 50149-
- Page 407 and 408:
Test: F31 Project: 11603-005 50149-
- Page 409 and 410:
Test: F33-MF2 Project: 50149-001 11
- Page 411 and 412:
Test: F35 Project: 11603-005 50149-
- Page 413 and 414:
Test: F37 Project: 11603-005 50149-
- Page 415 and 416:
Test: F39-MF2 Project: 50149-001 11
- Page 417 and 418:
Test: F41 Project: 11603-005 50149-
- Page 419 and 420:
Test No.: NHI-F2 Project No.: 50149
- Page 421 and 422:
Test: HNI-F4 Project: 11603-005 501
- Page 423 and 424:
Prophecy Platinum Corporation - Wel
- Page 425 and 426:
Test: LCT-1 Metallurgical Predictio
- Page 427 and 428:
Test: LCT-2 Project No.:50149-001 O
- Page 429 and 430:
Test: LCT-3 Project: 50149-001 Date
- Page 431 and 432:
Test: LCT-3 Overall Stability Total
- Page 433 and 434:
Test: LCT-4 Metallurgical Predictio
- Page 435 and 436:
Test: LCT-5 Project: 50149-001 Date
- Page 437 and 438:
Test: LCT-5 Overall Stability 120 1
- Page 439 and 440:
Prophecy Platinum Corp 50149-101 MI
- Page 441 and 442:
Mineral Abundance (wt.%) 100 90 80
- Page 443 and 444:
Prophecy Platinum Corp 50149-101 MI
- Page 445 and 446:
Prophecy Platinum Corp 50149-101 MI
- Page 447 and 448:
Prophecy Platinum Corp 50149-101 MI
- Page 449 and 450:
Prophecy Platinum Corp 50149-101 MI
- Page 451 and 452:
Prophecy Platinum Corp 50149-101 MI
- Page 453 and 454:
Prophecy Platinum Corp 50149-101 MI
- Page 455 and 456:
Prophecy Platinum Corp 50149-101 MI
- Page 457 and 458:
Mineral Abundance (wt.%) 100 90 80
- Page 459 and 460:
Prophecy Platinum Corp 50149-101 MI
- Page 461 and 462:
Prophecy Platinum Corp 50149-101 MI
- Page 463 and 464:
Prophecy Platinum Corp 50149-101 MI
- Page 465 and 466:
Prophecy Platinum Corp 50149-101 MI
- Page 467 and 468:
Prophecy Platinum Corp 50149-101 MI
- Page 469 and 470:
Prophecy Platinum Corp 50149-101 MI
- Page 471 and 472:
Mineral Abundance (wt.%) Mineral Ab
- Page 473 and 474:
Mineral Abundance (wt.%) Mineral Ab
- Page 475 and 476:
Mass (% Pentlandite) 100 Normalized
- Page 477 and 478:
Mass (% Pentlandite) 100 90 80 70 6
- Page 479 and 480:
Page 11 of 23
- Page 481 and 482:
Mass (% Pyrrhotite) 100 Normalized
- Page 483 and 484:
Mass (% Pyrrhotite) 100 90 80 70 60
- Page 485 and 486:
Page 17 of 23
- Page 487 and 488:
Mass (% Chalcopyrite) 100 Normalize
- Page 489 and 490:
Absolute Mass of Chalcopyrite Acros
- Page 491 and 492:
Mass (% Fe Oxides) 100 Normalized M
- Page 493 and 494:
Chlorite SiO2 TiO2 Al2O3 Cr2O3 MgO
- Page 495 and 496:
Chlorite SiO2 TiO2 Al2O3 Cr2O3 MgO
- Page 497 and 498:
SUMMARY TerraMS-12JUL-001 Wellgreen
- Page 499 and 500:
TerraMS-12JUL-001 Wellgreen - Pt-Pd
- Page 501 and 502:
TerraMS-12JUL-001 Wellgreen - Pt-Pd
- Page 503 and 504:
TerraMS-12JUL-001 Wellgreen - Pt-Pd
- Page 505 and 506:
TerraMS-12JUL-001 Wellgreen - Pt-Pd
- Page 507 and 508:
TerraMS-12JUL-001 Wellgreen - Pt-Pd
- Page 509 and 510:
TerraMS-12JUL-001 Wellgreen - Pt-Pd
- Page 511 and 512:
TerraMS-12JUL-001 Wellgreen - Pt-Pd
- Page 513 and 514:
TerraMS-12JUL-001 Wellgreen - Pt-Pd
- Page 515 and 516:
APPENDIX D : MINING 1.1 P IT O PTIM
- Page 517 and 518:
1.2 M INE D ESIGN AND S CHEDULING F
- Page 519 and 520:
1.3 M INE E QUIPMENT S ELECTION 1.3
- Page 521 and 522:
Year 39, the number of shovels requ
- Page 523 and 524:
Table 7 Truck and Shovel Requiremen