10.3.2 2011 DRILL PROGRAM<br />

The drilling conducted by Prophecy Platinum in 2011 was designed initially to<br />

delinate the potential resource of the <strong>Wellgreen</strong> deposit by targeting the area<br />

between the East and West Zones to prove that the zones are not separate, but one<br />

continuous zone. The focus of the program evolved to test the hanging wall<br />

disseminated sulphides located in the ultramafic unit.<br />

Drilling was <strong>com</strong>pleted by E. Caron Drilling of Whitehorse. A total of six drillholes<br />

were <strong>com</strong>pleted during the 2011 drill program from June to October. All holes were<br />

drilled HQ and all drilling was run in five foot intervals (1.52 m).<br />

The collars were initially spotted with a hand held GPS or <strong>com</strong>pass and chain, with<br />

the final <strong>com</strong>pleted collars again surveyed with a hand held GPS, <strong>com</strong>pass and<br />

chain or a total station GPS. Down-hole surveys were <strong>com</strong>pleted using the ReflexIt ©<br />

tool. Survey readings were collected approximately 9 m off the bottom of the hole<br />

and at approximately 152 m intervals up the hole. Erroneous directional readings<br />

located within the mineralized zones were discarded due to the magnetic influence of<br />

the pyrrhotite. Inclination readings were not affected by the magnetic minerals.<br />

Table 10.3 provides the collar information for the drill program <strong>com</strong>pleted by<br />

Prophecy Platinum. Table 10.4 provides the highlights of the drill program <strong>com</strong>pleted<br />

by Prophecy Platinum. Core lengths in the table do not represent true widths.<br />

Figure 10.1 shows the position of the 2011 drillholes relative to the mineralized zones<br />

on the Property. Boreholes <strong>com</strong>pleted in 2011 are not incorporated into the resource<br />

estimation.<br />

Table 10.3 Prophecy Platinum 2011 Drill Collars<br />

Borehole<br />

ID<br />

Grid East<br />

(m)<br />

Grid North<br />

(m)<br />

Elevation<br />

(masl)<br />

Prophecy Platinum Corp. 10-4 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada<br />

Dip<br />

(°)<br />

Azimuth<br />

(°)<br />

Depth<br />

(m)<br />

WS11-184 3600.00 14900.00 1,255.00 -45.00 0.00 507.49<br />

WS11-185 3250.00 14900.00 1,380.00 -55.00 0.00 59.13<br />

WS11-188 2600.00 15300.00 1,633.73 -70.00 0.00 491.03<br />

WS11-190 2800.00 15250.00 1,554.48 -70.00 0.00 373.08<br />

WS11-191 2400.00 15250.00 1,566.67 -70.00 0.00 89.92<br />

WS11-192 2700.00 15300.00 1,604.80 -70.00 0.00 404.47