Table 21.7 Contingency (US$ million)<br />

Pre-production<br />

(2012 to 2018)<br />

Sustaining<br />

(2019 to 2054 )<br />

Closure<br />

(2051 to 2054 )<br />

LOM Total<br />

(2012 to 2054 )<br />

<strong>Project</strong> Execution 4.7 0.0 0.0 4.7<br />

Surface Facilities 138.3 0.0 0.0 138.3<br />

Major Mine Equipment 28.0 104.3 0.0 132.3<br />

Other Mine Equipment 1.4 6.0 0.0 7.4<br />

Support Mine Equipment 0.2 1.1 0.0 1.3<br />

Refurbish Power Plant 0.0 12.3 0.0 12.3<br />

TMF 0.0 100.7 0.0 100.7<br />

Closure 0.0 0.0 12.2 12.2<br />

Total Contingency 172.6 224.4 12.2 409.2<br />

21.2.5 PROCESSING E QUIPMENT CAPITAL COSTS<br />

The capital costs for the process equipment were derived from those in the<br />

equipment list shown in Table 21.8. These are the main pieces that have been used<br />

to determine the capital and operating costs.<br />

Table 21.8 Major Process Equipment List<br />

Equipment Quantity Size<br />

Stockpile Feed Conveyor 1 200 m long x 106.7 cm wide<br />

Primary Jaw Crusher 2 122 cm x 152 cm<br />

SAG Mill Feed Conveyor 2 200 m long x 106.7 cm wide<br />

SAG Mill and Drive 2 7.0 m diameter x 3.0 m long<br />

Grinding Mill Liner Crane 4 -<br />

Ball Mills and Drives 2 6.24 m diameter x 14.68 m long<br />

Primary Rougher Flotation Cell Bank 2 10 Cell; 14.2 m 3 /cell<br />

Secondary Rougher Feed Thickener 2 122 m diameter<br />

Secondary Rougher Flotation Cell Bank 2 10 Cell; 111 m 3 /cell<br />

Primary Cleaner Flotation Cell Bank 2 10 Cell; 14.2 m 3 /cell<br />

Secondary Cleaner Flotation Cell Bank 2 10 Cell; 8.5 m 3 /cell<br />

Scavenger Flotation Cell Bank 2 10 Cell; 200 m 3 /cell<br />

Air Compressor 2 235 cm capacity<br />

Concentrate Thickener 2 15.2 m diameter<br />

Concentrate Pressure Filter 2 121 m 2 filtration area<br />

Tailings Thickener 2 122 m diameter<br />

The costs for these pieces of equipment were <strong>com</strong>piled from the InfoMine, Mine and<br />

Mill Equipment Costs: An Estimator's Guide 2011, as well as historic data from other<br />

projects. Historical pricing was escalated to Q2 2012 dollars using InfoMine cost<br />

indices. InfoMine Estimator’s Guides are annual collections of industry prices for<br />

Prophecy Platinum Corp. 21-5 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!