Prophecy Platinum Corporation – <strong>Wellgreen</strong> Property – <strong>Project</strong> 50149-001<br />

Introduction<br />

A metallurgical test program was initiated by Mr. Danniel Oosterman on behalf of Prophecy Platinum<br />

Corporation. Mr. Oosterman requested a mineralogical and metallurgical study of one master <strong>com</strong>posite<br />

on material from <strong>Wellgreen</strong> deposit.<br />

The present scoping study was intended to investigate the flotation conditions and to improve mineral<br />

recoveries to advance the understanding of mineral recoveries for Cu, Ni, and PGM by flotation.<br />

The scope of the program included sample preparation, mineralogy, grindability and flotation tests on a<br />

Master Composite and a High Ni Composite sample prepared from several areas of the mine which would<br />

establish a flowsheet capable of producing copper and nickel concentrates. Copper/nickel separation<br />

testwork was conducted on the master <strong>com</strong>posite bulk concentrate.<br />

While it is recognized that the different areas in the mine vary to some degree with regard to Cu-Ni-PGM<br />

ratios, the detailed testwork was <strong>com</strong>pleted on the Master Composite.<br />

Mr. Danniel Oosterman and Mr. Mike Ounpuu represented the client and the results were forwarded to<br />

them as they became available. Mr Gary Johnson from Strategic Metallurgy Pty Ltd, Perth, Australia also<br />

provided re<strong>com</strong>mendation to the testwork program. The optimization test program was conducted under<br />

the direction of consulting metallurgist Mr. Ounpuu, regular meetings and email <strong>com</strong>munications were<br />

held over the duration of the project.<br />

Jalal Tajadod, Ph.D., P.Eng.,<br />

Senior Metallurgist<br />

Jake Lang, B.E. Sc.,<br />

Manager Metallurgy<br />

Experimental work by: Yonika Wiputri, Wei Meng, Brue Sun, Max Ahn, Amy Yang, Virginia Robinson<br />

Report preparation by: Jalal Tajadod<br />

Reviewed by: Jake Lang<br />

SGS Minerals Services<br />

vi