ultimate impoundment surface area of 555 ha. The total catchment area of the TMF<br />

will be 740 ha.<br />

Water dams are required during the construction period and initial years of operation.<br />

They will protect the lined upstream faces of the tailings starter dams from significant<br />

flood events, provide a reliable source of fresh water during operation of the process<br />

plant, and minimize runoff from the TMF. The water dams will be incorporated into<br />

the downstream toe of the dam and have been planned so that they will be<br />

constructed simultaneously with the starter dams before tailings placement.<br />

Prophecy Platinum Corp. 18-4 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada