Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NiEq<br />

Cut-off Tonnes<br />

NiEq<br />

(%)<br />

Ni<br />

(%)<br />

Cu<br />

(%)<br />

Prophecy Platinum Corp. 14-13 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada<br />

Co<br />

(%)<br />

Pt<br />

(g/t)<br />

Pd<br />

(g/t)<br />

Au<br />

(g/t)<br />

0.75 11,521,600 1.61 0.79 0.71 0.06 1.13 0.81 0.59<br />

0.80 11,216,800 1.63 0.80 0.72 0.06 1.14 0.82 0.59<br />

0.85 10,723,200 1.67 0.82 0.73 0.06 1.16 0.83 0.61<br />

0.90 10,257,200 1.70 0.84 0.75 0.06 1.18 0.85 0.62<br />

0.95 9,758,600 1.74 0.87 0.77 0.06 1.20 0.86 0.63<br />

1.00 9,354,300 1.77 0.88 0.78 0.06 1.22 0.87 0.63<br />

Table 14.12 <strong>Wellgreen</strong> Pitshell Inferred Resource Cut-off Table<br />

NiEq<br />

Cut-off Tonnes<br />

NiEq<br />

(%)<br />

Ni<br />

(%)<br />

Cu<br />

(%)<br />

Co<br />

(%)<br />

Pt<br />

(g/t)<br />

Pd<br />

(g/t)<br />

Au<br />

(g/t)<br />

0.10 460,021,000 0.58 0.30 0.24 0.02 0.38 0.32 0.16<br />

0.15 455,884,000 0.59 0.31 0.24 0.02 0.38 0.33 0.16<br />

0.20 446,649,000 0.60 0.31 0.25 0.02 0.38 0.33 0.16<br />

0.25 403,731,000 0.64 0.33 0.27 0.02 0.42 0.35 0.17<br />

0.30 370,872,000 0.67 0.34 0.29 0.02 0.44 0.37 0.18<br />

0.35 333,963,000 0.71 0.36 0.31 0.03 0.48 0.39 0.20<br />

0.40 288,238,000 0.76 0.38 0.34 0.03 0.52 0.42 0.22<br />

0.45 234,697,000 0.83 0.41 0.39 0.03 0.58 0.46 0.26<br />

0.50 185,150,000 0.93 0.45 0.45 0.03 0.65 0.50 0.30<br />

0.55 149,012,000 1.03 0.49 0.50 0.04 0.71 0.55 0.34<br />

0.60 126,413,000 1.11 0.53 0.55 0.04 0.77 0.58 0.37<br />

0.65 111,177,000 1.18 0.57 0.58 0.04 0.81 0.61 0.39<br />

0.70 98,831,000 1.24 0.60 0.61 0.05 0.85 0.63 0.41<br />

0.75 88,376,000 1.30 0.63 0.64 0.05 0.88 0.66 0.42<br />

0.80 79,943,000 1.35 0.66 0.67 0.05 0.90 0.67 0.44<br />

0.85 71,935,000 1.41 0.70 0.70 0.05 0.93 0.68 0.45<br />

0.90 65,726,000 1.46 0.73 0.72 0.05 0.95 0.70 0.46<br />

0.95 59,875,000 1.52 0.77 0.75 0.05 0.97 0.71 0.47<br />

1.00 54,408,000 1.57 0.80 0.77 0.06 0.99 0.72 0.48<br />

The corresponding grade-tonnage curves for the Indicated and Inferred Resources<br />

within the pitshell are displayed in Figure 14.1 to Figure 14.4.