Test: HNI-F5 <strong>Project</strong>: 11603-005 50149-001 Date: 06-Mar-12 Operator: YW<br />

Purpose: Split flowsheet, CMC and Guar 50:50 mix<br />

Procedure: As below.<br />

Feed: 2 kg of -10 mesh High Ni Composite<br />

Grind: 57 minutes/2 kg at 65% solids in a lab mill<br />

Regrind 15 minutes in the pebble mill (Ni scav concentrate)<br />

Target Feed K80 : 90 µm<br />

Ni regrind K80: 37 µm<br />

Conditions:<br />

Reagents added, grams per tonne Time, minutes<br />

Stage Lime SIPX CuSO4 CMC Guar MIBC* Grind Cond. Froth pH Eh<br />

Grind 57<br />

Bulk Rougher 1 15 12 1 3 8.6 3.7<br />

Bulk Rougher 2 15 1 3 8.6 -71.1<br />

Ni Scav 1 20 6 8.6 -8.3<br />

Ni Scav 2 20 6 8.5 -2.2<br />

Ni Scav 3 20 6 8.5 -1.3<br />

Combine Ro Conc 1-2<br />

Bulk 1st Cleaner A 10 10 2 8.5 64.7<br />

B 2 2<br />

Bulk 2nd Cleaner 0 5 5 2 8.3 63.7<br />

5 2<br />

Combine Scav Conc 1-3<br />

Regrind (PM) 15<br />

Ni 1st Cleaner 5 5 5 3 8.6 53.6<br />

2 3<br />

Ni 2nd Cleaner 2 2 2 4 8.5 66.3<br />

Ni 3rd Cleaner 3 8.2 22.6<br />

Total 0 106 0 22 22 12 72 2<br />

*As needed<br />

45<br />

Stage Roughers 1stClnr and Scav. 2nd, 3rd Cleaner<br />

PSA on Ni regrind<br />

Flotation Cell 1000g-D12 500-g D12 250-g D12<br />

Assay for Cu, Ni, S<br />

Speed: rpm 1800 1600 1100<br />

To Sherbrooke<br />

Metallurgical Balance<br />

Product<br />

Weight Assays, % % Distribution<br />

g % Cu Ni S Cu Ni S<br />

Bulk 2nd Clnr Conc. 102 5.19 7.91 8.75 28.5 79.2 55.3 21.3<br />

Bulk 2nd Clnr Tail 48.6 2.46 0.23 1.07 16.8 1.1 3.2 6.0<br />

Bulk 1st Clnr Tail 162 8.23 0.09 0.45 13.1 1.4 4.5 15.5<br />

Ni 3rd Clnr Conc 14.8 0.75 4.04 3.73 24.0 5.9 3.4 2.6<br />

Ni 3rd Clnr Tail 14.9 0.76 0.47 1.90 20.1 0.7 1.7 2.2<br />

Ni 2nd Clnr Tail 32.2 1.63 0.55 2.29 9.96 1.7 4.6 2.3<br />

Ni 1st Clnr Tail 100 5.07 0.27 1.86 13.6 2.6 11.5 9.9<br />

Ni Scav Tail 1498 75.9 0.05 0.17 3.67 7.3 15.7 40.1<br />

Head (calc.) 1973 100.0 0.52 0.82 6.94 100.0 100.0 100.0<br />

(direct)<br />

Combined Products<br />

0.52 0.83 6.45<br />

Bulk 2nd Clnr Conc 102 5.19 7.91 8.75 28.5 79.2 55.3 21.3<br />

Bulk 1st Clnr Conc 151 7.65 5.44 6.28 24.7 80.3 58.5 27.3<br />

Bulk Rougher Conc 313 15.9 2.67 3.26 18.7 81.8 63.1 42.8<br />

Ni 3rd Clnr Conc 15 0.75 4.04 3.73 24.0 5.9 3.4 2.59<br />

Ni 2nd Clnr Conc 30 1.51 2.25 2.81 22.0 6.5 5.2 4.78<br />

Ni 1st Clnr Conc 62 3.14 1.37 2.54 15.8 8.3 9.7 7.13<br />

Ni Scav Conc 162 8.21 0.69 2.12 14.4 10.9 21.2 17.1<br />

Bulk Rghr+Scav Conc 475 24.1 1.99 2.87 17.25 92.7 84.3 59.9<br />

Metallurgical Balance<br />

Product<br />

Weight Assays, % % Distribution<br />

g % Cu Ni S other Cp Pn Po Ga Cu Ni S Cp Pn Po Ga<br />

Bulk 2nd Clnr Conc. 102.3 5.19 7.91 8.75 28.5 54.8 22.9 25.1 31.6 20.4 79.2 55.3 21.3 79.2 64.3 11.0 1.3<br />

Bulk 2nd Clnr Tail 48.6 2.46 0.23 1.07 16.8 81.9 0.7 2.3 40.9 56.1 1.1 3.2 6.0 1.1 2.8 6.8 1.7<br />

Bulk 1st Clnr Tail 162.3 8.23 0.09 0.45 13.1 86.4 0.3 0.6 33.2 65.9 1.4 4.5 15.5 1.4 2.6 18.3 6.7<br />

Ni 3rd Clnr Conc 14.8 0.75 4.04 3.73 24.0 68.2 11.7 10.2 42.9 35.3 5.9 3.4 2.6 5.9 3.8 2.2 0.3<br />

Ni 3rd Clnr Tail 14.9 0.76 0.47 1.90 20.1 77.5 1.4 4.7 46.8 47.1 0.7 1.7 2.2 0.7 1.7 2.4 0.4<br />

Ni 2nd Clnr Tail 32.2 1.63 0.55 2.29 10.0 87.2 1.6 6.3 19.0 73.1 1.7 4.6 2.3 1.7 5.1 2.1 1.5<br />

Ni 1st Clnr Tail 100.0 5.07 0.27 1.86 13.6 84.3 0.8 4.8 30.4 64.0 2.6 11.5 9.9 2.6 12.1 10.3 4.0<br />

Ni Scav Tail 1498 75.9 0.05 0.17 3.67 96.1 0.1 0.2 9.2 90.4 7.3 15.7 40.1 7.3 7.7 46.9 84.2<br />

Head (calc.) 1973 100.0 0.52 0.82 6.94 91.7 1.50 2.03 14.9 81.6 100.0 100.0 100.0 100.0 100.0 100.0 100.0<br />

(direct)<br />

Combined Products<br />

0.52 0.83 6.45<br />

Bulk 2nd Clnr Conc 102 5.19 7.9 8.8 28.5 54.8 22.9 25.1 31.6 20.4 79.2 55.3 21.3 79.2 64.3 11.0 1.3<br />

Bulk 1st Clnr Conc 151 7.65 5.44 6.28 24.7 63.6 15.7 17.8 34.6 31.9 80.3 58.5 27.3 80.3 67.1 17.8 3.0<br />

Bulk Rougher Conc 313 15.9 2.67 3.26 18.7 75.4 7.7 8.9 33.9 49.5 81.8 63.1 42.8 81.8 69.7 36.1 9.6<br />

Ni 3rd Clnr Conc 14.8 0.75 4.04 3.73 24.0 68.2 11.7 10.2 42.9 35.3 5.9 3.4 2.6 5.9 3.8 2.2 0.3<br />

Ni 2nd Clnr Conc 29.7 1.51 2.25 2.81 22.0 72.9 6.50 7.42 44.9 41.2 6.5 5.2 4.8 6.5 5.5 4.5 0.8<br />

Ni 1st Clnr Conc 62 3.14 1.37 2.54 15.8 80.3 3.95 6.83 31.4 57.8 8.3 9.7 7.1 8.3 10.6 6.6 2.2<br />

Ni Scav Conc 162 8.2 0.69 2.12 14.4 82.8 1.99 5.60 30.8 61.6 10.9 21.2 17.1 10.9 22.7 17.0 6.2<br />

Bulk Rghr+Scav Conc 475 24.1 1.99 2.87 17.2 77.9 5.76 7.78 32.8 53.7 92.7 84.3 59.9 92.7 92.3 53.1 15.8