21.0 C APITAL AND O PERATING C OSTS<br />

21.1 S UMMARY<br />

The total pre-production cost of the capital cost for the <strong>Project</strong> is US$863 million.<br />

The total capital cost required for the <strong>Project</strong> including sustaining capital is estimated<br />

at US$1,985 million. This estimate includes a 25% contingency.<br />

The capital costs are itemized as pre-production capital cost and sustaining capital<br />

cost and are summarized in Table 21.1.<br />

Table 21.1 Capital Cost Summary (US$ million)<br />

Pre-production<br />

(2012 to 2018)<br />

Sustaining<br />

(2019 to 2054 )<br />

LOM Total<br />

(2012 to 2054)<br />

Pre-production Capital Cost 863 0 863<br />

Sustaining Capital Cost 0 1,122 1,122<br />

Total 863 1,122 1,985<br />

The total operating costs for the LOM are US$12.1 billion. The total cost and unit<br />

costs (US$/t) are summarized in Table 21.2.<br />

Table 21.2 LOM Operating Cost Summary (US$ million)<br />

Cost<br />

(US$)<br />

Cost<br />

(%)<br />

Unit Cost<br />

US$/t mined<br />

Unit Cost<br />

US$/t milled<br />

Open Pit Mining 3,656.5 30 2.52 9.02<br />

Site Services 436.9 4 0.30 1.08<br />

G&A 931.6 8 0.65 2.29<br />

Processing 7,030.8 58 4.85 17.35<br />

Total 12,055.8 100 8.32 29.74<br />

Prophecy Platinum Corp. 21-1 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!