17.5 P ROCESS P LANT<br />

The process plant is located along the main access road to the Property,<br />

approximately 5 km from the Alaska Highway turn off as shown in Figure 18.1. It is<br />

located approximately 9 km from the pit and 1 km from the TMF. Both the dump<br />

pocket and the primary crusher will be housed in an open structure. All grinding,<br />

flotation, reagent preparation, concentrate loadout, and ancilliaries will be housed in<br />

a heated building to protect the equipment from the cold Yukon climate. The large<br />

tailings thickeners will remain outside.<br />

17.6 P ROCESS C APITAL AND O PERATING C OSTS<br />

The process capital and operating costs have been summarized in Table 17.3 and<br />

Table 17.4 respectively. The process capital costs are based on the equipment list<br />

as shown in Table 17.2 as well as estimates for the buildings and supporting<br />

infrastructure required for the equipment.<br />

Table 17.3 Process Capital Cost Summary<br />

Process Area<br />

Capital<br />

Cost<br />

(US$)<br />

Mineralized Material Storage and Recovery 5,980,804<br />

Crushing 10,126,321<br />

Milling (Building and Mills) 135,723,509<br />

Flotation 19,278,854<br />

Concentrate Dewatering, Storage, and Load-out 3,314,964<br />

Reagent Preparation 2,943,091<br />

Grand Total 177,367,543<br />

The process operating costs are based on the power, labour, and consumables<br />

estimated for the mill in operation.<br />

Table 17.4 Process Operating Costs<br />

Annual<br />

Cost Percentage<br />

US$/t milled (US$) (%)<br />

Electrical Power 8.28 92,737,776 47<br />

Labour 0.69 7,706,981 4<br />

Consumables 8.68 97,271,303 49<br />

Grand Total 17.65 197,716,060 100<br />

Prophecy Platinum Corp. 17-6 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!