Figure 1.4 Pre-tax IRR – Sensitivity Analysis<br />

IRR %<br />

50%<br />

45%<br />

40%<br />

35%<br />

30%<br />

25%<br />

20%<br />

15%<br />

10%<br />

5%<br />

0%<br />

1.13 P ROJECT D EVELOPMENT P LAN<br />

-20% -10% Base 10% 20%<br />

FX Ni Price Opex Capex<br />

The <strong>Project</strong> will take approximately 2.5 years of construction activities to <strong>com</strong>plete.<br />

Construction permitting is expect in Q2 2016. The mine will <strong>com</strong>mence operation<br />

Q3 2018. Figure 1.5 illustrates the execution plan for the <strong>Project</strong>.<br />

Prophecy Platinum Corp. 1-16 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!