Test: HNI-F4 <strong>Project</strong>: 11603-005 50149-001 Date: March 1 2012 Operator: YW<br />

Purpose: Split flowsheet, CMC and Guar 50:50 mix<br />

Procedure: As below.<br />

Feed: 2 kg of -10 mesh High Ni Composite<br />

Grind: 57 minutes/2 kg at 65% solids in a lab mill<br />

Regrind 8 minutes in the pebble mill (Ni scav concentrate)<br />

Target Feed K80 : 90 µm<br />

Conditions:<br />

Reagents added, grams per tonne Time, minutes<br />

Stage Lime SIPX CuSO4 CMC Guar MIBC* Grind Cond. Froth pH Eh<br />

Grind 57<br />

Bulk Rougher 1 15 12 1 3 8.4 94.1<br />

Bulk Rougher 2 10 1 3 8.4 24.6<br />

Ni Scav 1 30 6 8.4 -8.8<br />

Ni Scav 2 30 6 8.3 -7.2<br />

Ni Scav 3 30 6 8.2 -55.4<br />

Combine Ro Conc 1-2<br />

Bulk 1st Cleaner A 10 10 2 8.3 74.3<br />

B 2 2<br />

Bulk 2nd Cleaner 0 5 5 2 8.0 82.5<br />

5 2<br />

Combine Scav Conc 1-3<br />

Regrind (PM) 8<br />

Ni 1st Cleaner 7.5 10 10 3 8.5 61.1<br />

5 3<br />

Ni 2nd Cleaner 2 1 1 4 7.6 113.3<br />

Ni 3rd Cleaner 3<br />

Total 0 136.5 0 26 26 12 65 2<br />

*As needed<br />

45<br />

Stage<br />

Roughers 1stClnr and Scav. 2nd, 3rd Cleaner<br />

Flotation Cell<br />

1000g-D12 500-g D12 250-g D12<br />

Speed: rpm<br />

1800 1600<br />

1100<br />

Metallurgical Balance<br />

Product<br />

Weight Assays, % % Distribution<br />

g % Cu Ni Pt Pd Au S Fe MgO Cu Ni Pt Pd Au S Fe MgO<br />

Bulk 2nd Clnr Conc. 79.0 4.00 9.68 9.07 2.35 7.46 0.81 28.0 35.3 2.51 77.0 43.3 17.3 52.1 32.94 16.6 7.7 0.5<br />

Bulk 2nd Clnr Tail 44.0 2.23 0.78 5.55 1.80 2.59 0.14 16.5 27.3 12.9 3.5 14.8 7.4 10.1 3.17 5.4 3.3 1.5<br />

Bulk 1st Clnr Tail 77.8 3.94 0.27 2.13 1.10 0.72 0.06 10.6 20.5 18.2 2.1 10.0 8.0 5.0 2.40 6.2 4.4 3.7<br />

Ni 3rd Clnr Conc 31.0 1.57 1.62 2.80 3.2 2.00 1.46 30.2 47.2 4.31 5.1 5.2 9.1 5.5 23.30 7.0 4.1 0.4<br />

Ni 3rd Clnr Tail 16.8 0.85 0.45 1.88 2.06 1.02 0.26 27.2 44.3 6.44 0.8 1.9 3.2 1.5 2.25 3.4 2.1 0.3<br />

Ni 2nd Clnr Tail 42.8 2.17 0.33 1.35 1.78 0.81 0.20 21.0 36.8 10.5 1.4 3.5 7.1 3.1 4.41 6.7 4.4 1.2<br />

Ni 1st Clnr Tail 154 7.80 0.13 0.50 0.84 0.38 0.10 13.4 26.0 14.2 2.0 4.7 12.1 5.2 7.93 15.5 11.1 5.8<br />

Ni Scav Tail 1529 77.4 0.05 0.18 0.25 0.13 0.03 3.42 14.8 21.4 8.2 16.6 35.7 17.6 23.61 39.2 62.9 86.6<br />

Head (calc.) 1974 100.0 0.50 0.84 0.54 0.57 0.10 6.76 18.2 19.1 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0<br />

(direct)<br />

Combined Products<br />

0.52 0.83 0.57 0.61 0.10 6.45 18.1 19.8<br />

Bulk 2nd Clnr Conc 79 4.00 9.68 9.07 2.4 7.46 0.81 28.0 35.3 2.51 77.0 43.3 17.34 52.14 32.94 16.57 7.75 0.52<br />

Bulk 1st Clnr Conc 123 6.23 6.50 7.81 2.2 5.72 0.57 23.9 32.4 6.23 80.5 58.1 24.74 62.22 36.11 22.01 11.1 2.03<br />

Bulk Rougher Conc 201 10.2 4.08 5.61 1.75 3.78 0.37 18.7 27.8 10.9 82.6 68.1 32.74 67.17 38.51 28.19 15.5 5.78<br />

Ni 3rd Clnr Conc 31 1.57 1.62 2.80 3.2 2.00 1.46 30.2 47.2 4.31 5.1 5.2 9.12 5.48 23.30 7.01 4.06 0.35<br />

Ni 2nd Clnr Conc 48 2.42 1.21 2.48 2.8 1.66 1.04 29.1 46.2 5.06 5.8 7.2 12.35 7.00 25.55 10.44 6.13 0.64<br />

Ni 1st Clnr Conc 91 4.59 0.79 1.94 2.3 1.26 0.64 25.3 41.7 7.63 7.2 10.6 19.47 10.07 29.95 17.17 10.5 1.83<br />

Ni Scav Conc 245 12.4 0.38 1.04 1.38 0.70 0.30 17.8 31.8 11.8 9.3 15.3 31.56 15.24 37.88 32.63 21.6 7.62<br />

Bulk Rghr+Scav Conc 445 22.6 2.05 3.10 1.55 2.09 0.33 18.2 30.0 11.4 91.8 83.4 64.29 82.42 76.39 60.82 37.1 13.39<br />

Metallurgical Balance<br />

Product<br />

Weight Assays, % % Distribution<br />

g % Cu Ni S other Cp Pn Po Ga Cu Ni S Cp Pn Po Ga<br />

Bulk 2nd Clnr Conc. 79.0 4.00 9.68 9.07 28.0 53.3 28.0 26.2 24.8 21.0 77.0 43.3 16.6 77.0 50.2 6.9 1.0<br />

Bulk 2nd Clnr Tail 44.0 2.23 0.78 5.55 16.5 77.2 2.3 15.8 27.2 54.8 3.5 14.8 5.4 3.5 16.8 4.2 1.5<br />

Bulk 1st Clnr Tail 77.8 3.94 0.27 2.13 10.6 87.0 0.8 5.8 21.8 71.6 2.1 10.0 6.2 2.1 10.9 6.0 3.4<br />

Ni 3rd Clnr Conc 31.0 1.57 1.62 2.80 30.2 65.4 4.7 7.0 68.0 20.3 5.1 5.2 7.0 5.1 5.3 7.4 0.4<br />

Ni 3rd Clnr Tail 16.8 0.85 0.45 1.88 27.2 70.5 1.3 4.3 65.6 28.8 0.8 1.9 3.4 0.8 1.8 3.9 0.3<br />

Ni 2nd Clnr Tail 42.8 2.17 0.33 1.35 21.0 77.3 1.0 3.0 51.0 45.1 1.4 3.5 6.7 1.4 3.1 7.7 1.2<br />

Ni 1st Clnr Tail 154.0 7.80 0.13 0.50 13.4 86.0 0.4 0.8 33.7 65.1 2.0 4.7 15.5 2.0 2.9 18.2 6.2<br />

Ni Scav Tail 1529 77.4 0.05 0.18 3.42 96.3 0.2 0.2 8.5 91.1 8.2 16.6 39.2 8.2 9.1 45.7 86.0<br />

Head (calc.) 1974 100.0 0.50 0.84 6.76 91.9 1.45 2.09 14.4 82.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0<br />

(direct)<br />

Combined Products<br />

0.52 0.83 6.45<br />

Bulk 2nd Clnr Conc 79 4.00 9.68 9.07 28.0 53.3 28.0 26.2 24.8 21.0 77.0 43.3 16.6 77.0 50.2 6.9 1.0<br />

Bulk 1st Clnr Conc 123 6.23 6.50 7.81 23.9 61.8 18.8 22.5 25.6 33.1 80.5 58.1 22.0 80.5 67.0 11.1 2.5<br />

Bulk Rougher Conc 201 10.2 4.08 5.61 18.7 71.6 11.8 16.0 24.2 48.0 82.6 68.1 28.2 82.6 77.9 17.1 6.0<br />

Ni 3rd Clnr Conc 31.0 1.57 1.62 2.80 30.2 65.4 4.68 7.01 68.0 20.3 5.1 5.2 7.0 5.1 5.3 7.4 0.4<br />

Ni 2nd Clnr Conc 47.8 2.42 1.21 2.48 29.1 67.2 3.49 6.06 67.2 23.3 5.8 7.2 10.4 5.8 7.0 11.3 0.7<br />

Ni 1st Clnr Conc 91 4.59 0.79 1.94 25.3 72.0 2.29 4.62 59.5 33.6 7.2 10.6 17.2 7.2 10.1 19.0 1.9<br />

Ni Scav Conc 245 12.4 0.38 1.04 17.8 80.8 1.09 2.20 43.3 53.4 9.3 15.3 32.6 9.3 13.1 37.2 8.1<br />

Bulk Rghr+Scav Conc 445 22.6 2.05 3.10 18.2 76.6 5.92 8.42 34.7 51.0 91.8 83.4 60.8 91.8 90.9 54.3 14.0