16.5.4 EXPLOSIVES<br />

A contractor will supply, deliver and load explosives into the blastholes under the<br />

supervision of the drill/blast foreman. The contractor will erect a plant and storage<br />

facility on-site.<br />

16.6 U LTIMATE P IT D ESIGN<br />

Based on the optimization results and current geological model, Tetra Tech used Pit<br />

Shell 26 as the guide for the ultimate pit design, the results of which are provided in<br />

Table 16.7. Tetra Tech assumed an overall mining recovery of 95% and a waste<br />

rock dilution of 5%. The design has 4% less mineralized material and waste<br />

contained in the pit <strong>com</strong>pared to Pit Shell 26. The pit design can be improved with<br />

further design work. This ultimate pit was designed to check the practicality of the<br />

final pit shell that was used in the production schedule.<br />

Table 16.7 Ultimate Pit Design Results*<br />

Rock<br />

NiEq<br />

(%) Tonnes<br />

Prophecy Platinum Corp. 16-18 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada<br />

Ni<br />

(%)<br />

Cu<br />

(%)<br />

Pt<br />

(g/t)<br />

Pd<br />

(g/t)<br />

Indicated 0.22 > 100.0 14,567,641 0.69 0.62 0.99 0.73 0.51 0.05 1.40<br />

Inferred 0.22 > 100.0 374,446,759 0.33 0.25 0.40 0.35 0.17 0.02 0.63<br />

Total Mineable Resource 389,014,400 0.34 0.27 0.42 0.36 0.19 0.02 0.66<br />

Inferred 0.0 > 0.22 28,417,639 0.07 0.03 0.04 0.06 0.02 0.01 0.13<br />

Waste 0.0 > 0.22 978,436,132 - - - - - - -<br />

Total Waste 1,006,853,771 - - - - - - -<br />

Total Rocks Mined 1,395,868,171 - - - - - - -<br />

Stripping Ratio 2.59 - - - - - - -<br />

Note: *These numbers were not used in production scheduling. Production scheduling was<br />

done based on optimum pit shell.<br />

Figure 16.11 illustrates the ultimate pit design. The pit can be accessed either a<br />

west side or east side entrance. There are two distinctive bottoms for the pit that are<br />

separated by a discountinuity in the deposit. The east side of the pit is the deepest<br />

part and will be mined at the end of the mine life.<br />

Au<br />

(%)<br />

Co<br />

(%)<br />

NiEq<br />

(%)