14.2 P REVIOUS E STIMATES<br />

Table 14.15 <strong>com</strong>pares the basic parameters of the historic 2011 estimate with the<br />

current 2012 NI 43-101 <strong>com</strong>pliant resource.<br />

Table 14.16 illustrates the differences in the historic resource estimate with the<br />

current NI 43-101 <strong>com</strong>pliant resource.<br />

Table 14.15 Model Differences<br />

2012 Tetra Tech PEA Model 2011 Tetra Tech Resource Model<br />

Number of Drillholes 702 702<br />

Grade Capping Parrish Analysis Parrish Analysis<br />

East Zone - 4.14% Cu, 2.05 g/t Au,<br />

5.15 g/t Pd, 5.72 g/t Pt<br />

East Zone - 4.14% Cu, 2.05 g/t Au,<br />

5.15 g/t Pd, 5.72 g/t Pt<br />

West Zone - 2.29 g/t Au West Zone - 2.29 g/t Au<br />

Composite Length East Zone - 2.5 m East Zone - 2.5 m<br />

West Zone - 2.5 m West Zone - 2.5 m<br />

Metal Prices US$9.40/lb Ni US$9.52/lb Ni<br />

US$2.96/lb Cu US$2.96/lb Cu<br />

US$15.80/lb Co US$15.78/lb Co<br />

US$1,200/troy oz Au US$1,085/troy oz Au<br />

US$1,938/troy oz Pt US$1,776/troy oz Pt<br />

US$816/troy oz Pd US$689/troy oz Pd<br />

Cut-off Grade 0.2% NiEq 0.4% NiEq<br />

Number of Mineral<br />

Zones<br />

2 2<br />

Block Size 20 x 10 x 20 (4,000 m 3 ) 20 x 10 x 20 (4,000 m 3 )<br />

Resource Summary All blocks above cut-off within<br />

optimized pitshell<br />

All blocks above cut-off<br />

Estimation Method OK with ID and NN validation OK with ID and NN validation<br />

Table 14.16 Model Comparisons<br />

2012 Tetra Tech PEA Model<br />

Tonnes<br />

Prophecy Platinum Corp. 14-31 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada<br />

Ni<br />

(%)<br />

Cu<br />

(%)<br />

Co<br />

(%)<br />

Au<br />

(g/t)<br />

Pt<br />

(g/t)<br />

Indicated Resource @ 0.2% NiEq cut-off 14,423,900 0.68 0.62 0.05 0.51 0.99 0.73<br />

Inferred Resources @ 0.2% NiEq cut-off 446,649,000 0.31 0.25 0.02 0.16 0.38 0.33<br />

2011 Tetra Tech Resource Model<br />

Indicated Resource @ 0.4% NiEq cut-off 14,308,000 0.69 0.62 0.05 0.52 0.99 0.74<br />

Pd<br />

(g/t)<br />

Inferred Resources @ 0.4% NiEq cut-off 289,246,000 0.38 0.35 0.03 0.23 0.53 0.42