01.06.2013 Views

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

All of the data from logging the core was recorded in hand written logs and then<br />

transferred to Microsoft Excel spreadsheets, for later import into a geological<br />

software package.<br />

10.4.3 PROPHECY PLATINUM METHOD AND APPROACH<br />

The following description of the sampling methodology was provided by Rory<br />

Calhoun, P.Geo.:<br />

• Drill core is delivered to the core shack (Figure 10.2) by the diamond drill<br />

contractor.<br />

• Core boxes are sorted and placed in groups of three.<br />

• Group of boxes are photographed.<br />

• Run markers and other marker blocks are checked for accuracy.<br />

• The geologist collects RQD and recovery data on a paper form, to be<br />

transferred later to a spreadsheet.<br />

• Core is logged by the geologist on a paper form.<br />

There are no lithological codes, as the logs are written long hand.<br />

There is only one geologist logging the core for consistency.<br />

• The minimum sample unit is 2”; maximum sample length is 5 ft (1.52 m).<br />

• Samples do not cross lithological contacts.<br />

• The sample is marked on the box with the footage and sample number.<br />

• Samples are taken to the core cutting facility for cutting by a technician<br />

(Figure 10.3).<br />

The saw uses fresh water which drains into sump below the floor before<br />

decanting to the creek.<br />

The core is cut and placed back into the core box.<br />

The core box with cut core is returned to the core shack for sampling.<br />

• The geologist and technician collect the cut core from the same side and<br />

place samples in clean plastic bags with a sample tag. The sample number<br />

is written on the outside of the sample bag.<br />

• QA/QC samples are inserted into the sample stream at prescribed intervals.<br />

Full description of the QA/QC program is provided in Section 11.0.<br />

• Five samples bags are placed in rice bags and a record is made of the<br />

sample number placed in each rice bag.<br />

• The core is stored on core racks inside a secure building or shipping<br />

container on the Property which has a full time security guard living on site<br />

(Figure 10.4 and Figure 10.5).<br />

Prophecy Platinum Corp. 10-6 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!