01.06.2013 Views

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

28.0 CERTIFICATES OF QUALIFIED PERSON<br />

EUR. ING. ANDREW J. CARTER, C.ENG., MIMMM, SAIMM, SME<br />

I, Eur. Ing. Andrew Carter, C.Eng., MIMMM, SAIMM, SME of Swindon, United<br />

Kingdom, do hereby certify:<br />

• I am the Director of Metallurgy with Tetra Tech WEI Inc. with a business<br />

address at Ground Floor, Unit 2, Apple Walk, Kembrey, Swindon, United<br />

Kingdom, SN2 8BL.<br />

• This certificate applies to the technical report entitled <strong>Wellgreen</strong> <strong>Project</strong><br />

<strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>, Yukon, Canada, dated August 1, 2012<br />

(the “Technical Report”).<br />

• I am a graduate of the University of Leeds, (B.Sc. Minerals Processing, 1980).<br />

I am a member in good standing of the Institute of Materials, Minerals and<br />

Mining, Membership #46421. My relevant experience is the extractive<br />

metallurgy of nickel, copper and platinum group metals. I am a “Qualified<br />

Person” for purposes of National Instrument 43-101 (the “Instrument”).<br />

• I did not <strong>com</strong>plete a personal inspection of the Property.<br />

• I am responsible for Sections 1.1, 1.7 to 1.9, 1.13 to 1.14, 2.0, 13.0, 17.0 to<br />

20.0, 24.0, 25.3, 25.4, 26.3 to 26.5, 27.0 (except the Geology section), and<br />

28.0 of the Technical Report.<br />

• I am independent of Prophecy Platinum Corp. as defined by Section 1.5 of<br />

the Instrument.<br />

• I have no prior involvement with the Property that is the subject of the<br />

Technical Report.<br />

• I have read the Instrument and the parts of the Technical Report that I am<br />

responsible for has been prepared in <strong>com</strong>pliance with the Instrument.<br />

• As of the date of this certificate, to the best of my knowledge, information<br />

and belief, the parts of the Technical Report that I am responsible for<br />

contains all scientific and technical information that is required to be<br />

disclosed to make the technical report not misleading.<br />

Signed and dated this 1 st day of August, 2012 at Swindon, United Kingdom<br />

“Original document signed and sealed by<br />

Eur. Ing. Andrew Carter, C.Eng., MIMMM, MSAIMM, SME”<br />

Eur. Ing. Andrew Carter, C.Eng., MIMMM, MSAIMM, SME<br />

Director of Metallurgy<br />

Tetra Tech WEI Inc.<br />

Prophecy Platinum Corp. 28-1 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!