Prophecy Platinum Corporation – <strong>Wellgreen</strong> Property – <strong>Project</strong> 50149-001<br />

o Design <strong>com</strong>minution testing should be considered for proper mill sizing and production<br />

forecasting. Selection of specific samples for SAG mill design (including and not limited<br />

to JK DWT, SMC, SPI, CWI) and ball mill sizing (BWI).<br />

• The collection of additional variability information is re<strong>com</strong>mended through a variability test<br />

programme on the samples from various geological origin and grades.<br />

• Conduct further grinding tests on more variability <strong>com</strong>posites.<br />

SGS Minerals Services<br />