topographic survey of the open pit and waste stockpiling areas at a suitable scale,<br />

will be required for the next level of study design.<br />

WASTE ROCK DUMP DESIGN<br />

The stability of the waste rock piles placed near the open pit needs to be determined.<br />

Testing on the load carrying capacity of the overburden and its deformation<br />

characteristics will be required to determine a suitable setback from the pit limits to<br />

ensure that the overburden does not flow towards the pit. Time constraints on how<br />

long it will take to <strong>com</strong>press the overburden material, need to be determined in order<br />

to sequence the waste placement.<br />

Waste dump progression planning should be an integral part of subsequent levels of<br />

study, in order to optimize rock placement for stability and optimize waste haul cycle<br />

times.<br />

The acid generating potential of the waste rock needs to be assessed. Sequencing<br />

of the waste placement and remedial measures to mitigate any potential problems<br />

requires assessment.<br />

The possibility of metal leaching also needs to be tested to determine if this is an<br />

issue.<br />

PRODUCTION RATE<br />

Based on the 32,000 t/d (11.2 Mt/a) open pit base case scenario, the potential to<br />

improve the overall project economics exists with increased throughput. That rate<br />

should be determined by a trade-off study.<br />

Another potential trade-off studiy that could be considered in the future includes haul<br />

truck versus conveyor for mineralized material transport to the mill. This study would<br />

be highly dependant on the Mill site location.<br />

The estimated cost for the first phase of the above work is US$50,000.<br />

26.3 M ETALLURGY<br />

It is re<strong>com</strong>mended that further metallurgical test work be undertaken in order to<br />

develop the metallurgical process flowsheet. An MF2 type flowsheet as suggested in<br />

this report or similar arrangement can be considered. A laboratory program to<br />

analyze the appropriate flotation reagents and dosages as well as other flotation<br />

variables is currently underway. Once this is <strong>com</strong>pleted an MF2 or similar flowsheet<br />

should be tested in the laboratory to determine how it will perform on this material.<br />

Test work should include the creation of a bulk concentrate and separate nickel and<br />

copper concentrates, to determine the extent to which the PGEs follow the nickel, the<br />

copper or how they may be distributed between two concentrates.<br />

Prophecy Platinum Corp. 26-5 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!