01.06.2013 Views

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

Wellgreen Project Preliminary Economic Assessment ... - OTCIQ.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 26.2 Quill Creek Ultramafic Delineation Budget<br />

<strong>Project</strong> Activity<br />

Rate<br />

(US$) Units<br />

Cost<br />

(US$)<br />

East Zone Diamond drilling* TBD TBD TBD<br />

Downhole geophysics TBD TBD TBD<br />

High resolution topographic survey TBD TBD TBD<br />

Re-assay old pulps for Rh, Ru, Ir, Os TBD TBD TBD<br />

Indirect Costs Salaries TBD TBD TBD<br />

Fuel TBD TBD TBD<br />

Administration – Camp TBD TBD TBD<br />

Consumable TBD TBD TBD<br />

Total 6,372,000<br />

Note: *Includes all drilling related charges, sample analysis, dozing, support.<br />

26.1.3 OTHER RECOMMENDATIONS<br />

Tetra Tech re<strong>com</strong>mends that Prophecy Platinum <strong>com</strong>pile the historic information in a<br />

<strong>com</strong>prehensive drillhole and assay database and validate the historic collar locations<br />

as far as possible through search and survey. The database should include, but not<br />

necessarily be limited to, a program name for each drillhole record, drillhole start<br />

date, <strong>com</strong>pletion date, logger, down-hole survey methods, collar survey <strong>com</strong>ment, an<br />

indication whether the collar has been validated, where the samples were assayed<br />

and the method of analysis (including digestion method), if this can be determined.<br />

Re<strong>com</strong>mendations made for the QA/QC program include the following items:<br />

• The <strong>com</strong>pany geologist should review the results of the field-inserted QA/QC<br />

data and it is also good practice for the geologist to review the laboratoryinternal<br />

QA/QC data.<br />

• A selection of course rejects or pulps samples (up to 10%) should be sent to<br />

a second laboratory.<br />

• The insertion rate of one blank, one duplicate and one SRM should be<br />

maintained for every 20 samples.<br />

• The insertion location of the blank QA/QC sample should be moved away<br />

from the SRM sample. The blank sample is currently placed immediately<br />

after the SRM. Blank samples should be placed immediately after or within<br />

suspected high grade intervals to monitor contamination within the<br />

preparation facility.<br />

In order to improve the potential economics of the project, additional assays should<br />

be run for rhodium, ruthenium, rhenium, iridium and osmium. This would provide a<br />

dataset of sufficient size and quality to <strong>com</strong>plete co-kriging. It is re<strong>com</strong>mended that<br />

20 to 25% of the pulps or coarse rejects from the past drilling campaigns and all<br />

future drilling campaigns be selected and that a PGE suite of analysis be run. The<br />

Prophecy Platinum Corp. 26-3 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!