25.2 M INING<br />

Table 25.1 <strong>Wellgreen</strong> Resource Estimate Summary<br />

NiEq<br />

Cut-off Category Zone Tonnes NiEq%<br />

Prophecy Platinum Corp. 25-2 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada<br />

Ni<br />

(%)<br />

Cu<br />

(%)<br />

Co<br />

(%)<br />

Au<br />

(g/t)<br />

Pt<br />

(g/t)<br />

Pd<br />

(g/t)<br />

0.2 Indicated Pitshell 14,432,900 1.4 0.68 0.62 0.05 0.51 0.99 0.73<br />

0.2 Inferred Pitshell 446,649,000 0.6 0.31 0.25 0.02 0.16 0.38 0.33<br />

There is good potential to expand the quantity and grade of mineralization on the<br />

Property to cover the entire Quill Creek Ultramafic intrusive. The Quill Creek<br />

intrusive has been outlined by an aeromagnetic survey. Drilling on the adjacent<br />

Burwash claims held by Prophecy Platinum indicates that the mineralizing system<br />

has the potential to continue along the entire 10 km strike length.<br />

Exploration to date has concentrated on the lower gabbroic section of the ultramafic<br />

body. Recent exploration has concentrated on the evaluation of the Property’s<br />

potential to host larger, but lower grade, tonnages of PGM enriched nickel-copper<br />

mineralization for potential open pit extraction. The occurrences of higher grade<br />

pockets of semi-massive sulphides (more than 1% copper and nickel and more than<br />

2 g/t platinum) as historically mined by Hudson Yukon Mining are expected to be<br />

continually located through exploration efforts. These higher grade pockets,<br />

although not continuous, could be targeted in a potential open pit operation in order<br />

to accelerate the <strong>Project</strong>’s pay back.<br />

A large portion of the drill data set does not include platinum, palladium assay,<br />

rhodium, ruthenium, rhenium, iridium, osmium, which would potentially enhance any<br />

sort of economic evaluation of the Property.<br />

Little in the way of SG is available despite several years of exploration and limited<br />

operations.<br />

Based on the economic parameters and optimized pit shell determined from the pit<br />

optimization analysis, the ultimate pit design for the project generated the key results<br />

shown in Table 25.2.<br />

Table 25.2 Optimum Pit Shell Results<br />

Item<br />

Tonnes<br />

(Mt)<br />

Ni<br />

(%)<br />

Cu<br />

(%)<br />

Co<br />

(%)<br />

Au<br />

(g/t)<br />

Pt<br />

(g/t)<br />

Pd<br />

(g/t)<br />

Mineralized Material<br />

Indicated 14.5 0.65 0.59 0.05 0.489 0.942 0.698<br />

Inferred 390.8 0.31 0.25 0.02 0.165 0.391 0.334<br />

Waste Rock 1,043.0 - - - - - -<br />

Stripping Ratio 2.57:1 - - - - - -