1.9 E NVIRONMENTAL S TUDIES, P ERMITTING AND S OCIAL OR<br />

C OMMUNITY I MPACT<br />

1.9.1 ENVIRONMENTAL CONSIDERATIONS<br />

Environmental permits and registrations that may be required for the <strong>Project</strong> are<br />

summarized in Section 20.0.<br />

Environmental assessments (EAs) in Yukon are administered by the Yukon<br />

Environmental and Socio-economic <strong>Assessment</strong> Board (YESAB), as governed by<br />

the Yukon Environmental and Socio-economic <strong>Assessment</strong> Act (YESAA). The EA<br />

process in Yukon is a single assessment process that applies throughout Yukon, to<br />

all projects, and to the federal, territorial, and First Nations governments. Quartz<br />

mining projects that are conducted anywhere other than on an Indian Reserve, are<br />

subject to an EA. The <strong>Project</strong> will be subject to an EA under the YESAA.<br />

1.9.2 SOCIAL CONSIDERATIONS<br />

Several First Nations are identified as having interests en<strong>com</strong>passing the Property<br />

and access road. The implementation of an effective <strong>com</strong>munity and Aboriginal<br />

engagement program is fundamental to the successful environmental permitting of<br />

mining projects. Consultations with First Nations whose land is part of the <strong>Project</strong> (or<br />

who might be significantly affected environmentally or socioeconomically), must be<br />

conducted before submitting a proposal for an EA in Yukon. This is a legal obligation<br />

on the part of the industry under the YESAA.<br />

1.10 C APITAL AND O PERATING C OSTS<br />

1.10.1 CAPITAL COST<br />

The total capital cost required for the <strong>Project</strong>, including a 25% contingency is<br />

estimated at US$2.0 billion and is distributed based on the following costs:<br />

• pre-production costs – US$0.9 billion<br />

• sustaining capital for the LOM – US$1.1 billion.<br />

The capital costs are itemized as pre-production and sustaining as summarized in<br />

Table 1.6.<br />

Prophecy Platinum Corp. 1-10 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada