PHASE III<br />

During Phase III, the pit will deepen and expand to the east, west, and south. Phase<br />

III will involve the mining of 100.8 Mt of mineralized material, which will satisfy the<br />

capacity of the mill for 9 years. Figure 16.8 illustrates the Phase III pit at the end of<br />

Year 20.<br />

Figure 16.8 3D Rendered Image of Phase III Pit and Mineralized Area<br />

PHASE IV<br />

During Phase IV, the pit will deepen and expand primarily to the east. Phase IV will<br />

involve the mining of 100.8 Mt of mineralized material, which will satisfy the capacity<br />

of the mill for 9 years. Figure 16.9 illustrates the Phase IV pit at the end of Year 29<br />

of the mine life.<br />

Figure 16.9 3D Rendered Image of Phase IV Pit and Mineralized Area<br />

Prophecy Platinum Corp. 16-16 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!