Test: F37 <strong>Project</strong>: 11603-005 50149-001 Date: Feb 23 2012 Operator: YW<br />

Purpose: Split flowsheet, CMC and Guar 50:50 mix similar to F-36, no CMC or Guar in the roughers<br />

Procedure: As below.<br />

Feed: 2x2 kg of -10 mesh Master Composite<br />

Grind:<br />

Regrind<br />

57 minutes/2 kg at 65% solids in a lab mill<br />

Regrind 8 minutes in the pebble mill (Ni clnr 1 concentrate) Feed K80 : 90 µm<br />

Conditions:<br />

Ni regrind K80: µm<br />

Reagents added, grams per tonne Time, minutes<br />

Stage Lime SIPX CuSO4 CMC Guar MIBC* Grind Cond. Froth pH Eh<br />

Grind 57<br />

Bulk Rougher 1 15 12 1 3 8.8 76.3<br />

Bulk Rougher 2 20 6 1 3 8.8 8.9<br />

Ni Scav 1 30 200 6 6 8.7 32.5<br />

Ni Scav 2 30 6 8.5 38.9<br />

Ni Scav 3 30 6 8.3 11.2<br />

Combine Ro Conc 1-2<br />

Bulk 1st Cleaner A 10 10 2<br />

B 10 2 8.4 74.0<br />

Bulk 2nd Cleaner A 0 5 5 2 8.3 71.5<br />

B 5 2<br />

Combine Scav Conc 1-3<br />

Ni 1st Cleaner 20 15 15 3 8.5 74.1<br />

10 3 8.4 21.4<br />

Regrind (PM) 8<br />

Ni 2nd Cleaner 20 50 5 5 4<br />

Ni 3rd Cleaner 10 2.5 2.5 3 7.9 87.6<br />

Total 0 200 250 37.5 37.5 24 65 2<br />

*As needed<br />

45<br />

Stage Rougher 2nd clnr<br />

3rd clnr<br />

Flotation Cell 2000 g D-12 500 g D-12 250 g D-12<br />

Speed: r.p.m. 1500 1600<br />

1200<br />

Metallurgical Balance<br />

Product<br />

Weight Assays, (Pt, Pd, Au g/t), (Cu, Ni, S, Fe, MgO %)<br />

% Distribution<br />

g % Cu Ni Pt Pd Au S Fe MgO Cu Ni Pt Pd Au S Fe MgO<br />

Bulk 2nd Clnr Conc. 119.7 3.01 10.8 8.56 1.88 6.27 0.94 29.2 30.9 4.30 81.5 53.3 13.9 51.7 39.4 24.2 7.3 0.6<br />

Bulk 2nd Clnr Tail 52.1 1.31 0.37 1.97 1.58 2.00 0.21 7.34 13.9 21.4 1.2 5.3 5.1 7.2 3.7 2.6 1.4 1.3<br />

Bulk 1st Clnr Tail 145 3.64 0.16 0.63 0.84 0.62 0.14 4.45 11.7 22.2 1.5 4.7 7.5 6.2 7.1 4.5 3.3 3.9<br />

Ni 3rd Clnr Conc 137.5 3.46 0.44 1.69 3.02 0.31 0.37 32.1 46.7 5.36 3.8 12.1 25.7 2.9 17.7 30.5 12.6 0.9<br />

Ni 3rd Clnr Tail 43.4 1.09 0.41 0.83 1.71 0.91 0.15 18.1 30.4 14.3 1.1 1.9 4.6 2.7 2.3 5.4 2.6 0.7<br />

Ni 2nd Clnr Tail 79.8 2.01 0.28 0.54 0.39 0.26 0.17 17.4 30.3 13.5 1.4 2.2 1.9 1.4 4.7 9.6 4.7 1.3<br />

Ni 1st Clnr Tail 111 2.79 0.17 0.29 0.70 0.41 0.14 2.27 10.9 22.4 1.2 1.7 4.8 3.2 5.6 1.7 2.4 3.0<br />

Ni Scav Tail 3286 82.7 0.04 0.11 0.18 0.11 0.02 0.94 10.2 22.4 8.3 18.8 36.5 24.7 19.5 21.4 65.7 88.3<br />

Head (calc.) 3974 100.0 0.40 0.48 0.41 0.37 0.07 3.64 12.8 21.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0<br />

(direct)<br />

Combined Products<br />

0.33 0.42 0.41 0.45 0.04 2.53 11.9 22.8<br />

Bulk 2nd Clnr Conc 119.7 3.01 10.8 8.56 1.9 6.27 0.94 29.2 30.9 4.3 81.5 53.3 13.9 51.7 39.4 24.2 7.3 0.6<br />

Bulk 1st Clnr Conc 171.8 4.32 7.64 6.56 1.8 4.98 0.72 22.6 25.7 9.5 82.7 58.6 19.0 58.9 43.2 26.8 8.7 2.0<br />

Bulk Rougher Conc 316.6 7.97 4.22 3.85 1.35 2.98 0.45 14.3 19.3 15.3 84.2 63.3 26.5 65.1 50.3 31.3 12.0 5.8<br />

Ni 3rd Clnr Conc 137.5 3.46 0.44 1.69 3.0 0.31 0.37 32.1 46.7 5.4 3.8 12.1 25.7 2.9 17.7 30.5 12.6 0.9<br />

Ni 2nd Clnr Conc 180.9 4.55 0.43 1.48 2.7 0.45 0.32 28.7 42.8 7.5 4.9 14.0 30.2 5.7 20.0 36.0 15.2 1.6<br />

Ni 1st Clnr Conc 260.7 6.56 0.39 1.19 2.0 0.40 0.27 25.3 39.0 9.3 6.3 16.2 32.2 7.1 24.6 45.6 19.9 2.9<br />

Ni Scav Conc 371.6 9.35 0.32 0.92 1.61 0.40 0.23 18.4 30.6 13.2 7.5 17.9 37.0 10.3 30.2 47.3 22.3 5.9<br />

Bulk Rghr+Scav Conc 688.2 17.3 2.11 2.27 1.49 1.59 0.34 16.5 25.4 14.2 91.7 81.2 63.5 75.3 80.5 78.6 34.3 11.7<br />

Metallurgical Balance<br />

Product<br />

Weight Assays, % % Distribution<br />

g % Cu Ni S other Cp Pn Po Ga Cu Ni S Cp Pn Po Ga<br />

Bulk 2nd Clnr Conc. 119.7 3.01 10.8 8.56 29.2 51.4 31.2 24.7 26.2 17.9 81.5 53.3 24.2 81.5 64.1 10.7 0.60<br />

Bulk 2nd Clnr Tail 52.1 1.31 0.37 1.97 7.34 90.3 1.07 5.44 13.4 80.1 1.2 5.3 2.6 1.2 6.1 2.38 1.16<br />

Bulk 1st Clnr Tail 145 3.64 0.16 0.63 4.45 94.8 0.46 1.55 9.8 88.2 1.5 4.7 4.5 1.5 4.9 4.8 3.6<br />

Ni 3rd Clnr Conc 137.5 3.46 0.44 1.69 32.1 65.8 1.27 3.55 79.0 16.2 3.8 12.1 30.5 3.8 10.6 37.0 0.6<br />

Ni 3rd Clnr Tail 43.4 1.09 0.41 0.83 18.1 80.7 1.18 1.58 44.5 52.8 1.1 1.9 5.4 1.1 1.5 6.6 0.6<br />

Ni 2nd Clnr Tail 79.8 2.01 0.28 0.54 17.4 81.8 0.81 0.74 43.7 54.7 1.4 2.2 9.6 1.4 1.3 11.9 1.2<br />

Ni 1st Clnr Tail 111 2.79 0.17 0.29 2.27 97.3 0.49 0.63 4.90 94.0 1.2 1.7 1.7 1.2 1.5 1.9 2.9<br />

Ni Scav Tail 3286 82.7 0.04 0.11 0.94 98.9 0.12 0.14 2.21 97.5 8.3 18.8 21.4 8.3 10.1 24.8 89.3<br />

Head (calc.) 3974 100.0 0.40 0.48 3.64 95.5 1.15 1.16 7.38 90.3 100.0 100.0 100.0 100.0 100.0 100.0 100.0<br />

(direct)<br />

Combined Products<br />

0.33 0.42 2.53<br />

Bulk 2nd Clnr Conc 119.7 3.01 10.8 8.56 29.2 51.4 31.2 24.7 26.2 17.9 81.5 53.3 24.2 81.5 64.1 10.7 0.6<br />

Bulk 1st Clnr Conc 171.8 4.32 7.64 6.56 22.6 63.2 22.1 18.9 22.3 36.7 82.7 58.6 26.8 82.7 70.2 13.1 1.8<br />

Bulk Rougher Conc 316.6 7.97 4.22 3.85 14.3 77.7 12.2 10.9 16.6 60.3 84.2 63.3 31.3 84.2 75.1 17.9 5.3<br />

Ni 3rd Clnr Conc 137.5 3.46 0.44 1.69 32.1 65.8 1.27 3.55 79.0 16.2 3.8 12.1 30.5 3.8 10.6 37.0 0.6<br />

Ni 2nd Clnr Conc 180.9 4.55 0.43 1.48 28.7 69.3 1.25 3.08 70.7 25.0 4.9 14.0 36.0 4.9 12.1 43.6 1.3<br />

Ni 1st Clnr Conc 260.7 6.56 0.39 1.19 25.3 73.1 1.12 2.36 62.4 34.1 6.3 16.2 45.6 6.3 13.4 55.5 2.5<br />

Ni Scav Conc 371.6 9.35 0.32 0.92 18.4 80.3 0.93 1.84 45.3 52.0 7.5 17.9 47.3 7.5 14.9 57.3 5.4<br />

Bulk Rghr+Scav Conc 688.2 17.3 2.11 2.27 16.5 79.1 6.11 6.03 32.1 55.8 91.7 81.2 78.6 91.7 89.9 75.2 10.7